[RE-wrenches] Batteries in 4' tall crawl space
Ray
ray at solarray.com
Thu Aug 2 00:22:56 EDT 2018
Never laid on my stomach, I just have kneel pad I use for lots of stuff
but it works good here too. I never get my face that close to the
battery any way. Usually 2 to 3 ft is good.
Ray Walters
Remote Solar
303 505-8760
On 8/1/18 2:21 PM, Glenn Burt wrote:
>
> Interesting idea, but it looks like to service them you would have to
> lay on your stomach and get your face right in there? Not my idea of a
> good time!
>
> -Glenn
>
> *From:*RE-wrenches <re-wrenches-bounces at lists.re-wrenches.org> *On
> Behalf Of *Ray
> *Sent:* Monday, July 30, 2018 3:32 PM
> *To:* re-wrenches at lists.re-wrenches.org
> *Subject:* Re: [RE-wrenches] Batteries in 4' tall crawl space
>
> Article 110.26 covering clearances in front of electrical equipment
> applies. I worked on a couple like that, and I didn't like it. Very
> hard to move the batteries, and Combined with H2S, you are in what
> OSHA considers a confined hazardous space.
>
> Another way to use that crawl space is to build a trap door access
> from the floor above. This can work really nicely, and put the
> batteries right under the inverter without violating article 110.26.
> I think I saw a system that either Allan Sindelar or Windy Dankoff did
> like that. I've tried it a few times, and everyone (customers and
> inspectors) was happy. Here's a pic of some HUPs in a floor vault just
> below the inverter:
>
> Ray Walters
> Remote Solar
> 303 505-8760
>
> On 7/30/18 8:37 AM, Dana wrote:
>
> Safe working clearance is 6’-8”.
>
> I have been confronted with this issue in the past taking over
> other’s systems care. This is a head banger & a major safety issue
> if something goes bad. If the batteries are 18-20” tall that only
> leaves anther 28-30” between bottom side of the floor joist & the
> top of the battery. Your face is way too close to a battery esp.
> if there is an issue to address.
>
> The installation is bent over back-heavy move situation. I am
> assuming you have a dirt or gravel floor to move across?
>
> It seems like a good use of space up front but the reality of the
> install plagues you down the road.
>
> If it is WLA batteries it is the worst of situations.
>
> Even if this is not inspected, please avoid this situation.
>
> ----------------------------------------------------------------------------
>
> Dana Orzel Great Solar Works, Inc.
>
> *C - 208.721.7003 dana at solarwork.com <mailto:dana at solarwork.com>*
>
> Idaho Contractor - # 028765 Idaho PV # 028374
>
> NABCEP # 051112-136 www.solarwork.biz <http://www.solarwork.biz>
>
> _"Responsible Technologies for Responsible People since 1988" _
>
> *P*Please consider the environment before printing this email.
>
> *From:* RE-wrenches <re-wrenches-bounces at lists.re-wrenches.org>
> <mailto:re-wrenches-bounces at lists.re-wrenches.org> *On Behalf Of
> *Jerry Caldwell
> *Sent:* Saturday, July 28, 2018 6:10 PM
> *To:* re-wrenches at lists.re-wrenches.org
> <mailto:re-wrenches at lists.re-wrenches.org>
> *Subject:* [RE-wrenches] Batteries in 4' tall crawl space
>
> Wrenches,
>
> I have a customer who wants to have batteries installed in a 4'
> tall crawl space / short basement. Are there any accessibility
> code issues with installing batteries in a crawl space? Does the
> NEC address this?
>
> Thanks,
> Jerry Caldwell
>
>
>
>
> _______________________________________________
>
> List sponsored by Redwood Alliance
>
> List Address:RE-wrenches at lists.re-wrenches.org
> <mailto:RE-wrenches at lists.re-wrenches.org>
>
> Change listserver email address & settings:
>
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive:http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
>
> www.re-wrenches.org/etiquette.htm
> <http://www.re-wrenches.org/etiquette.htm>
>
> Check out or update participant bios:
>
> www.members.re-wrenches.org <http://www.members.re-wrenches.org>
>
>
>
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> www.members.re-wrenches.org
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20180801/3c65e2ea/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 30843 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20180801/3c65e2ea/attachment.jpg>
More information about the RE-Wrenches
mailing list