[RE-wrenches] New Pge TOU rates

August Goers august at luminalt.com
Mon Jun 27 09:54:32 PDT 2016


Bill,



Yes, my understanding is that mandatory TOU doesn’t start until NEM 2.0
rolls out. For the sites that we’ve analyzed with TOU-A and TOU-B, it is
definitely better to have a South to West orientation, but other
orientations don’t necessarily kill the deal. The NEM 2.0 “haircut” is only
part of how the utilities are trying to recoup their costs. Rate schedules
are not nearly as solar friendly as they used to be! I wish we could have
E-7 again.



All this said, bill analysis is complicated and there is no one-size-all
solution. That’s why having a good bill analysis and simulation tool is
key.



-August



*From:* RE-wrenches [mailto:re-wrenches-bounces at lists.re-wrenches.org] *On
Behalf Of *frenergy
*Sent:* Monday, June 27, 2016 9:14 AM
*To:* re-wrenches at lists.re-wrenches.org
*Subject:* Re: [RE-wrenches] New Pge TOU rates



correct me if I'm wrong but doesn't this new mandatory assignment to TOU
with PG&E start when NEM2.0 starts.  I think we can keep using E1 up to the
change...which is soon.  Some sites just don't have good afternoon options
here in the Sierras (mountains, trees, etc)  Do we start declining jobs
that have excellent SE facing options?  Please enlighten me.

Bill

Feather River Solar Electric

Bill Battagin, Owner

4291 Nelson St.

Taylorsville, CA 95983

530.284.7849

CA Lic 874049

www.frenergy.net



On 6/27/2016 6:57 AM, August Goers wrote:

Hi Jason,



The mandatory switch to a TOU rate along with NEM 2.0 forces all of us
working with grid tied systems in CA to thoroughly rethink our game plan!
We have been using Energy Toolbase (as Mac mentioned) to model proposals to
accurately estimate post-solar bills under one of these new rates
schedules. TOU-A in my experience tends to be a little better for folks in
the “normal” monthly consumption range, say below 800-1000 kWh/month. High
energy users will probably be better off going TOU-B. For those with
electric vehicles, EV-A is a really good option. That said, we’re still
wrapping our heads around the best rates and design strategies. The peak
rates on the TOU schedules are getting later and later, so west facing
arrays are definitely a plus.



Cheers,



August

Luminalt



*From:* RE-wrenches [mailto:re-wrenches-bounces at lists.re-wrenches.org
<re-wrenches-bounces at lists.re-wrenches.org>] *On Behalf Of *Jason Andrade
*Sent:* Tuesday, June 21, 2016 4:59 PM
*To:* re-wrenches at lists.re-wrenches.org
*Subject:* [RE-wrenches] New Pge TOU rates



Hi Wrenches,



I am looking at the new rates for PG&E’s time of use and was wondering what
others in California are using Tou-A or Tou-B? it looks like if you have a
West facing array Tou-B is going to be the better choice if you can control
your usages.

http://www.pge.com/nots/rates/tariffs/ResTOUCurrent.xls

Thanks for any input







              Jason Andrade

                C-46# 974647

           (530) 410-4745 Cell

         Please follow the links

        below for great content!

[image: wcs-email-large] <http://www.westcoastsustainables.com/>

[image: youtube-email]
<https://www.youtube.com/channel/UC8CI90MX8k8IHxWUnnuBrtw>    [image:
fb-email]
<https://www.facebook.com/West-Coast-Sustainables-113295778708585/>

[image: ademail] <https://www.facebook.com/Anarchy51/?ref=settings>






_______________________________________________

List sponsored by Redwood Alliance



List Address: RE-wrenches at lists.re-wrenches.org



Change listserver email address & settings:

http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org



List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html



List rules & etiquette:

www.re-wrenches.org/etiquette.htm



Check out or update participant bios:

www.members.re-wrenches.org






--
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20160627/f463216e/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 4926 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20160627/f463216e/attachment-0016.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg
Type: image/jpeg
Size: 1456 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20160627/f463216e/attachment-0017.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.jpg
Type: image/jpeg
Size: 1847 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20160627/f463216e/attachment-0018.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image004.jpg
Type: image/jpeg
Size: 3336 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20160627/f463216e/attachment-0019.jpg>


More information about the RE-wrenches mailing list