[RE-wrenches] Grid Tie, battery back-up, feed in tarriff

Brian Mehalic brian at solarenergy.org
Tue Jul 2 09:07:30 PDT 2013


https://www.progress-energy.com/assets/www/docs/business/service_requirements_manual.pdf

Here's a link to the progress energy interconnection requirements for by all / sell all systems. Check out figures 64 and 65 and a couple others for some of their interconnection requirements. 

May be helpful. 

Brian

Typos courtesy of my iPhone. 

On Jul 2, 2013, at 11:41 AM, Bill Turberville <billturb at ece-llc.com> wrote:

> Does anyone have an one-line diagram for a grid-tie, battery back-up, for a feed in tariff (in the TVA service area)?  I have used a-c coupled in areas where there is net-metering, but TVA requires that there is a separate Generation meter, tied ahead for the service.
>  
>  
> William C. Turberville P.E.
> President
> ECE Solar
> Electrical Contracting Enterprises LLC
> 3080 Stage Post Dr ste 107
> Bartlett, TN 38133
> 901-348-9230 ext 101 phone
> 901-289-6346 cell
> 901-348-2192 FAX
>  
> _______________________________________________
> List sponsored by Home Power magazine
> 
> List Address: RE-wrenches at lists.re-wrenches.org
> 
> Change email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
> 
> List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
> 
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
> 
> Check out participant bios:
> www.members.re-wrenches.org
> 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20130702/f899a32a/attachment-0009.html>


More information about the RE-wrenches mailing list