[RE-wrenches] Grid Tie, battery back-up, feed in tarriff
Bill Turberville
billturb at ece-llc.com
Tue Jul 2 08:41:17 PDT 2013
Does anyone have an one-line diagram for a grid-tie, battery back-up, for a
feed in tariff (in the TVA service area)? I have used a-c coupled in areas
where there is net-metering, but TVA requires that there is a separate
Generation meter, tied ahead for the service.
William C. Turberville P.E.
President
ECE Solar
Electrical Contracting Enterprises LLC
3080 Stage Post Dr ste 107
Bartlett, TN 38133
901-348-9230 ext 101 phone
901-289-6346 cell
901-348-2192 FAX
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20130702/e81a0548/attachment-0002.html>
More information about the RE-wrenches
mailing list