I had a shock recently...
I was called to inspect a stand-alone system that had crashed after two
months. Both design and installation were poorly done. The system had 40
Exide E3600 golf carts wired as ten parallel strings. 2200 rated amp-hours,
with 1600 rated watts (49A) of PV and an AIR 403. The owners had never seen
100% on the LED voltmeter that was all they had for monitoring. Part of the
temporary fix, to get them charging again, was to remove 1/2 of the
batteries and set them aside.

On another job we redid, 16 L16s on a 12V system, with the cables attached
at one end...

We have much work to do, wrenches...

Allan @+E

----- Original Message -----
From: "Windy Dankoff, Dankoff Solar"
> Joel D said:
> >...
> >5. Most battery designers limit to 4 or 5 parallel strings by convention.
>
> I would stress the preference of having a single string, them
> minimize it, then maximum 4.

- - - -
To send a message: RE-wrenches at topica.com

Archive of previous messages: http://www.topica.com/lists/RE-wrenches/

List rules & etiquette: http://www.mrsharkey.com/wrenches/etiquete.htm

Check out participant bios: www.mrsharkey.com/wrenches/index.html

Hosted by Home Power magazine

Moderator: michael.welch at homepower.com

==^================================================================
EASY UNSUBSCRIBE click here: http://topica.com/u/?bz8Qcs.bz9JC9
Or send an email To: RE-wrenches-unsubscribe at topica.com
This email was sent to: michael.welch at homepower.com

T O P I C A -- Register now to manage your mail!
http://www.topica.com/partner/tag02/register
==^================================================================







More information about the RE-wrenches mailing list