[RE-wrenches] SMA Rapid Shutdown and Secure Power Supply
Harry Mahon
Michael.Mahon at sma-america.com
Thu Apr 28 12:11:25 EDT 2022
Dave - Unfortunately the SPS feature is not "back" fully. Choosing "yes" during commissioning for the SPS feature allows for it to work (with switch and outlet installed) but ONLY for the same solar day as an outage occurs.
When the Sunny Boy goes to sleep, the sunspec transmitter will stop and the array will be in shutdown the next day.
Apologies for any confusion, as this is not the "same" SPS that we have been talking about since 2013....
Please also note that choosing "yes" for the SPS feature during commissioning means the DC disconnect must be the Rapid Shutdown initiator, as the SunSpec signal must be disconnected from the array when the grid fails to trigger shutdown. If the AC breaker or other AC disconnect is to be used as the RSI, "no" should be chosen for that second menu choice after "Sunspec" is chosen for shutdown method on tab 4 of the Install Assistant.
It is unlikely that this generation of Sunny Boy will improve the SPS situation, but SMA is working to fully reintroduce the SPS feature with the next gen Sunny Boy. Stay tuned...
Best regards -
Mike
Michael Mahon
Senior Technical Trainer, Solar Academy
SMA America
3925 Atherton Rd
Rocklin, CA 95765
Mobile: +1 916 918 9412
www.SMA-America.com<https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.sma-america.com%2F&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C7c37bb11c19143be244508d8c4708123%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637475334767665428%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=Y%2FbXqYrd%2FX9hYC3%2BKsO%2Fn15XWX%2BoatBsL0IwlBOMjBA%3D&reserved=0>
Solar Academy website<https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fsolaracademy.sma.de%2Fen.html&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C7c37bb11c19143be244508d8c4708123%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637475334767675424%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=rEzoRJ8HjvBTPJKWI9zqi7e0VkiuRyd9FQalgtOLrdI%3D&reserved=0>
Upcoming SMA America Solar Academy webinars: English<https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fsolaracademy.sma.de%2Fen%2Fcourses.html%3Ffilter%255b1%255d%3DEnglish%26filter%255b2%255d%3DUnited%2520States&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C7c37bb11c19143be244508d8c4708123%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637475334767685417%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=qwU%2FexGKNX4XJrvnBi6D5ijuK0qarJyghtBVWKQH2iE%3D&reserved=0> and Spanish<https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fsolaracademy.sma.de%2Fen%2Fcourses.html%3Ffilter%255b1%255d%3DSpanish%26filter%255b2%255d%3DUnited%2520States&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C7c37bb11c19143be244508d8c4708123%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637475334767685417%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=kjV6E58mxunLvJr2%2BTPS6fSd%2BQlPZm8WqQIbtIeGOGI%3D&reserved=0>
[cid:image001.jpg at 01D85AE8.4EAB6EC0]<https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.smainverted.com%2F&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C90309a1470fd4699686008d9514294c8%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637630168696828295%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=%2BX8GAkfFNXxAxM565oOXOcNt3DnrrE7RzPccsQM2pzs%3D&reserved=0> [Linkedin Logo] <https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.linkedin.com%2Fcompany%2F364675&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C90309a1470fd4699686008d9514294c8%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637630168696838290%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=ywOykswEt%2FvRYn7N7JQ5510g0r7Avp%2FKlBVxcpy9NlY%3D&reserved=0> [cid:image003.jpg at 01D85AE8.4EAB6EC0] <https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.youtube.com%2Fplaylist%3Flist%3DPL840A5336CAC32332&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C90309a1470fd4699686008d9514294c8%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637630168696848287%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=z2mRFQr9f4oVyMhg0Bh02ooRf6UwOH3HET%2FczH2Upko%3D&reserved=0>
[Graphical user interface, text, website Description automatically generated]<https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.sma-america.com%2Fshadefix.html&data=04%7C01%7CMichael.Mahon%40sma-america.com%7C6a5e9a55c13f4be16cda08d9e6643a9a%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C0%7C637794140412323660%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=xiZdVY8duMb8z87LYBOpuMluD%2FHLrHDGMNXEtWT5QNk%3D&reserved=0>
This email and any attachments thereto may contain SMA America, LLC confidential, privileged and private material for the sole use of the intended recipient. Any review, copying, or distribution of this email (or any attachments thereto) by others is strictly prohibited. If you are not the intended recipient, please contact the sender immediately and permanently delete the original and any copies of this email and any attachments thereto. Thank you.
From: RE-wrenches <re-wrenches-bounces at lists.re-wrenches.org> On Behalf Of Dave Tedeyan via RE-wrenches
Sent: Wednesday, April 27, 2022 10:08 AM
To: RE-wrenches <re-wrenches at lists.re-wrenches.org>
Cc: Dave Tedeyan <dave at sungineersolar.com>
Subject: [RE-wrenches] SMA Rapid Shutdown and Secure Power Supply
Hi All,
The last SMA-41 inverter I commissioned, had the option for SunSpec rapid shutdown with Secure Power Supply. I just talked to a level one tech who was not particularly familiar, but told me that with a sunspec rapid shutdown device like the JMS-F, you can still use the Secure Power Supply as if there was no rapid shutdown. I had stopped installing the SPS on rooftop systems, because if losing grid power initiates rapid shutdown, then you clearly do not have the power to run a SPS. But it sounds like maybe the inverter has the smarts to wake the solar back up once you flip the switch to activate the SPS. Can anyone here verify this? Have you done this, and does it work as expected with no extra hardware needed?
Cheers,
Dave
--
[Logo]<https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.sungineersolar.com%2F&data=05%7C01%7Cmichael.mahon%40sma-america.com%7C577c331425984a024c5408da286833f3%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C1%7C637866725271115343%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000%7C%7C%7C&sdata=oiFM0QROF07HaZENjW%2BGUVdF6m8o1%2BnQ2Aa%2F1rxmVyo%3D&reserved=0>
Dave Tedeyan, P.E.
Owner | Sungineer Solar
p: he | him | his
a: 1653 Slaterville Rd. | Ithaca, NY 14850
w: www.sungineersolar.com<https://eur02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.sungineersolar.com%2F&data=05%7C01%7Cmichael.mahon%40sma-america.com%7C577c331425984a024c5408da286833f3%7Ca059b96c28294d1188374cc1ff84735d%7C0%7C1%7C637866725271115343%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C2000%7C%7C%7C&sdata=YZNvqxQmoUs4AKKOBGhLlgrPcrhmZTqItwa81TsZhB0%3D&reserved=0>
c: (607) 288-2898
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220428/7188ec26/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 717 bytes
Desc: image001.jpg
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220428/7188ec26/attachment.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg
Type: image/jpeg
Size: 731 bytes
Desc: image002.jpg
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220428/7188ec26/attachment-0001.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.jpg
Type: image/jpeg
Size: 480 bytes
Desc: image003.jpg
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220428/7188ec26/attachment-0002.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image004.jpg
Type: image/jpeg
Size: 19823 bytes
Desc: image004.jpg
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220428/7188ec26/attachment-0003.jpg>
More information about the RE-Wrenches
mailing list