[RE-wrenches] alternatives to Outback GSLC xxxx box?
Bradley Bassett
bbassett2 at gmail.com
Tue Mar 1 10:33:29 EST 2022
I think the blank GSLC comes with the main breaker bracket and the bus bars
for connecting them. What I have not had a chance to try is connecting the
breaker bus that usually connects the bottom of the two main breakers
directly to the upper bus bars, and not installing the two breakers at all.
It seems like it would fit, but until I see it done I would not specify it.
I've often specified a single 250A breaker, usually in a MidNite BCB, to
each inverter so that a single 4/0 cable can be used to each inverter. I've
been specifying this since the Radian came out and have had no reports of
the breaker tripping. This keeps the necessary bus bar size for multiple
inverters at a lower rating. Four inverters can be kept within the 1000A
rating of the MidNite BCB and the 1000A shunt can be used for the FNDC. If
you put all of the charge controllers in a FW500 or FW1000 you can use
those shunts for the solar to the FNDC.
Brad B
AEE Solar
On Tue, Mar 1, 2022 at 6:23 AM Kirk Herander <kirkh at vermont.solar> wrote:
> All,
>
> I am doing a multiple stacked Radian GS8048 system. And all I need in my
> design is two OB 175 a breakers in a box which integrates w/ each
> respective inverter. The manual bypass switch is useless, for all inverters
> need to be bypassed at once using a single external bypass. OB does not
> make a version of the GSLC which only has the inverter breakers. They do
> make an empty GSLC with nothing in it. But no mounting assembly for the
> breakers, and no add-on kit offering to do this either.
> I thought Midnite made something compatible, but don't see it on their web
> site. Any ideas? Thanks.
>
> --
>
> *Kirk Herander / **kirkh at vermont.solar <kirkh at vermont.solar>*
>
> *Owner|Principal, VT Solar, LLC*
>
> *Celebrating our 31st Anniversary 1991-2022!!*
>
> *www.vermont.solar*
> <https://nam02.safelinks.protection.outlook.com/?url=www.vermontsolarnow.com&data=02%7C01%7C%7C9f0330d75a244870112408d685311841%7C84df9e7fe9f640afb435aaaaaaaaaaaa%7C1%7C0%7C636842843233477645&sdata=0NjyuKeQbEK6245SNnk8X4XnP9Q%2B%2BqtvcALkdDghvk4%3D&reserved=0>
>
> dba Vermont Solar Engineering
>
> 802.863.1202
> _______________________________________________
> List sponsored by Redwood Alliance
>
> Pay optional member dues here: http://re-wrenches.org
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> There are two list archives for searching. When one doesn't work, try the
> other:
> https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> http://www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> http://www.members.re-wrenches.org
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220301/c42b59c3/attachment.htm>
More information about the RE-Wrenches
mailing list