Friends:
I am installing my first Blue Planet system today. I ordered an 8kWh unit
so that means only 4 of the 8 battery positions are filled. I can’t find
anything on the Blue Planet site or in the literature on how to implement
only 4 battery modules. I have called every Blue Planet number I can and
the advice I have been given is to load only the bottom positions. The
problem with that advice is if I do that the internal positive lead will
not reach the top battery and the battery bus bars look like they will be
unsupported on the top and prone to bending and maybe shorting.
This should be an easy manufacturer tech support answer, but I can’t seem
to get though or get an answer that makes sense. Have any of you installed
an 8kWh package and maybe have some guidance?
Thank in advance.
William Miller
Miller Solar
17395 Oak Road, Atascadero, CA 93422
805-438-5600
www.millersolar.com
CA Lic. 773985
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220131/fd1a463c/attachment.htm>
More information about the RE-Wrenches
mailing list