[RE-wrenches] SMA US 7.7 T-L 41

Drake drake.chamberlin at redwoodalliance.org
Thu Oct 3 11:34:05 EDT 2019


Hello Wrenches,

A TL-41 came instead of a TL -40. The mounting instructions say to 
use 2 screws on the conduit box under the inverter to hold up the 
entire unit Tech support is being  trained soon, but so far does not know.

Emacs!

Can this be right?

Thanks,

Drake
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20191003/d6524890/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 3c233df.jpg
Type: image/jpeg
Size: 100192 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20191003/d6524890/attachment.jpg>


More information about the RE-Wrenches mailing list