[RE-wrenches] 750 kcmil pulling
david quattro
david at quattrosolar.com
Wed Aug 27 08:13:35 PDT 2025
Hi everyone, I have a wire pull coming up where each 4" conduit will have
(2) 750 kcmil aluminum plus (2) 3/0 aluminum. I think this pull will
proceed just like previous similar wire pulls, but I want to see if there
are important tricks/details I should know about 750 kcmil size. I plan to
rent the biggest tugger available and to have a bucket of lube stationed at
the pipe entrance. We already ran mandrels through all conduits. The
longest pull is about 500 ft. Thanks!
David
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20250827/496ce3b2/attachment.htm>
More information about the RE-wrenches
mailing list