[RE-wrenches] More Issues with Parallel Sol-Ark 15K System
Sam Haraldson
sam at onsiteenergyinc.com
Fri Nov 15 08:37:11 PST 2024
>
> ...I don't see how that would put at risk "safeguarding the customer’s
> investment."
>
Jason, my understanding of the risk is the system is designed to output an
amount of power greater than or equal to the load requirements. If one or
more of the inverters fault but the load requirements remain the same the
functioning inverters are not capable of meeting that demand. Someone
please correct me if my understanding of that is wrong.
- Sam
[image: OnSite Energy]
<https://www.google.com/url?q=https://onsiteenergyinc.com/&source=gmail-html&ust=1677085494759000&usg=AOvVaw2NN36GoM1sjnS4RdC8Svt->
SAM HARALDSON
Operations Specialist
(406) 551-6135
1515 N. Rouse Ave Bozeman, MT 59715
Locally owned and operated since 2012
[image: B Corporation] <https://onsiteenergyinc.com/bcorp>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20241115/6cd8075d/attachment.htm>
More information about the RE-wrenches
mailing list