Friends:



I found a grid-tie battery-backup system with a 120/240 VAC critical loads
sub-panel that has no neutral run to it.  All of the 120 VAC loads have
their neutrals land in the meter panel.



I have always felt instinctively that the neutrals should land in the
breaker panel that feeds the circuit.  I have looked through the NEC to
find a passage that spells this out but I can seem to find one.



Is this a code requirement?  Is this recommended practice?



Thanks in advance.



William Miller



Miller Solar

17395 Oak Road, Atascadero, CA 93422

805-438-5600

www.millersolar.com