Hi Howie,

I would ask the AHJ and indicate you are simply reinstalling the system,
not reengineering anything.

I wouldn't take it for granted that the mounting hardware will be usable,
or cost effective to reuse. It's often seized, cross threaded, dirty etc.

There will be a lot of these coming up...

Good luck

On Thu, Mar 21, 2024, 7:29 AM Jason Szumlanski via RE-wrenches <
re-wrenches at lists.re-wrenches.org> wrote:

> Each state and jurisdiction could be different. Some didn't even want a
> permit around here after Hurricane Irna in 2017. After Hurricane Ian in
> 2022, virtually all did.
>
> As someone who has removed and reinstalled MANY systems to allow for
> hurricane damaged roof replacements, my approach has always been that the
> permit application was simply a structural application for the remounting
> of the solar panels. I indicated that the PV source conductors (or inverter
> output conductors in the case of microinverters) would simply be
> reconnected in a roof mounted junction box. This never rose to the level of
> requiring updating electrical wiring to current codes with respect to rapid
> shutdown or otherwise. We always made sure labels were legible and did any
> minor electrical cleanup, but I would not even provide a detailed
> electrical plan with our applications.
>
> Jason Szumlanski
> Principal Solar Designer | Florida Solar Design Group
> NABCEP Certified Solar Professional (PVIP)
> Florida State Certified Solar Contractor CVC56956
> Florida Certified Electrical Contractor EC13013208
>
>
> On Wed, Mar 20, 2024 at 9:35 PM Howie Michaelson via RE-wrenches <
> re-wrenches at lists.re-wrenches.org> wrote:
>
>> Hi all,
>> I have a potential job reinstalling an 11 year old 4.4kW roof mounted net
>> metered array, feeding a PVI 4kW inverter.   The array was pulled down by a
>> reputable company last fall, with the intention of remounting it after the
>> asphalt shingle roof was reroofed. From a distance, it appears that it was
>> carefully removed and all parts and pieces were saved.  Unfortunately the
>> company's principle died in the interim and the company folded. I'm trying
>> to determine if this scenario is grandfathered code wise, since it predates
>> RSD. If not, I'm not sure it is worth retrofitting it with add on Tigo or
>> APSMART equipment as opposed to replacing the whole system. In any case,
>> before we explore the options, I'm trying to determine if putting it back
>> up without RSD is (1) code compliant and (2) reasonable.
>> Thanks for any insight,
>> Howie Michaelson
>> Sun Catcher
>> _______________________________________________
>> List sponsored by Redwood Alliance
>>
>>
>> _______________________________________________
> List sponsored by Redwood Alliance
>
> Pay optional member dues here: http://re-wrenches.org
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> There are two list archives for searching. When one doesn't work, try the
> other:
> https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/
> http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> http://www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> http://www.members.re-wrenches.org
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20240321/b9179ce0/attachment.htm>


More information about the RE-wrenches mailing list