I'm far from an expert on this but it seems that I remember when the hubbub was going on about this series inverter that the present operating ones could continue most of them had that have the add on box

I would be very surprised if after it has been disconnected from the grid and shut down for two years if they would let it reconnect

I think they would treat it like a new install 

But that's just my opinion,
Bob

> On Feb 9, 2016, at 2:22 PM, Ray Walters <ray at solarray.com> wrote:
> 
> Greetings Esteemed Wrenches;
> 
> I just received an interesting call from an owner of a late 1990s vintage GTB system here in Colorado.  (Trace SW4048 I'm guessing) The tenants had disconnected the grid for almost 2 years and lived in the house off grid.  They had also done many scary wiring "upgrades" using speaker wire out of the main AC load center.
> The tenants are gone, the AC load center was cleaned up, and the owner wants to reconnect the GT system, but the utility is not allowing it since they were disconnected for 2 years.  I'm still trying to find out what the requirements are, but I wanted to ping the list and see what experience anyone had, and what requirements might be placed in this situation.
> It seems to me that this system should be grand fathered in and not be required to meet more than 1999 NEC, but I've never dealt with this scenario before.  Requiring this to meet 2014 NEC would be insane, and even meeting 2008 NEC would be a deal killer, as the old SW inverters were not UL 1741 compliant.  (wasn't even around in 1998 I believe)
> My plan was to inspect the entire system, retorque connections, perform any necessary repairs, and just confirm compliance with NEC 1999.  There would be little point, if the utility or AHJ required compliance with a newer code though.
> 
> Thanks as always for any assistance,
> 
> -- 
> R.Ray Walters
> CTO, Solarray, Inc
> Nabcep Certified PV Installer,
> Licensed Master Electrician
> Solar Design Engineer
> 303 505-8760
> 
> _______________________________________________
> List sponsored by Redwood Alliance
> 
> List Address: RE-wrenches at lists.re-wrenches.org
> 
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
> 
> List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
> 
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
> 
> Check out or update participant bios:
> www.members.re-wrenches.org
> 



More information about the RE-wrenches mailing list