[RE-wrenches] Grid tie with dump load?

Kristopher Schmid solman at legacysolar.com
Wed Sep 7 11:31:08 PDT 2016


REWs,

I have a client that asked me if i can install a battery free grid tied
system and have a dump load activate when it is overproducing.  I am at a
loss, here.  Anyone have ideas?  A CT on the line side that would activate
a relay while current is flowing to the utility?

Thanks,
Kris

-- 
Shine On!

Kris Schmid
Legacy Solar, LLC
864 Clam Falls Trail
Frederic, WI 54837
www.legacysolar.com
715-653-4295
NABCEP Certified PV Installer
Licensed Wisconsin Master Electrician
BSEE