FYI...
Every [Midnite] SMA E-Panel comes with a shunt trip breaker. SMA
requested this when they asked MidNite to design an E-Panel for them.
You will need the battery disconnect module to go with each E-Panel
though. The battery disconnect modules connect to the Birdhouse and to
the shunt trip breakers.
Robin
On 7/17/2015 12:14 PM, Mac Lewis wrote:
> Hey Steve,
>
> Yes I'm reading that code article closely and I think its open to
> interpretation. If you consider PV circuits to include the battery
> based inverters, you would need to include them in rapid shutdown.
>
> For some reason I thought it applied to all of the DC conductors,
> including the battery cabling, but it looks like that isn't explicitly
> called out. Midnites system does have a way to do it.. That will
> probably show up on the next code cycle.
>
> Thanks for pointing that out.
>
> On Fri, Jul 17, 2015 at 11:30 AM, Steve Jefferson
> <Steve.Jefferson at sma-america.com
> <mailto:Steve.Jefferson at sma-america.com>> wrote:
>
> Mac,
>
> Do you mean to ask for a way to shut down the Sunny Boys connected
> to the Multicluster box?
>
> Sunny Islands are not applicable to the rapid shutdown
> requirements. They are not PV.
>
> SMA America, LLC
>
> Steve Jefferson
>
> Service Line Supervisor
>
> 3925 Atherton Ave
>
> Rocklin, CA 95765 - 3714
>
> U.S.A.
>
> Tel: +1 916 625 3185 <tel:%2B1%20916%20625%203185> (direct)
>
> Fax: +1 916 625 0871 <tel:%2B1%20916%20625%200871>
>
> Mobile: +1 916 622 4253 <tel:%2B1%20916%20622%204253>
>
> Email: Steve.jefferson at SMA-America.com
> <mailto:Steve.jefferson at SMA-America.com>
>
> www.SMA-America.com <http://www.sma-america.com/>
>
> cid:image001.png at 01CF1CFA.FE18BEB0
> <http://www.youtube.com/watch?v=yQWzPuyqhzo&feature=youtu.be>
>
> This email and any attachments thereto may contain SMA America,
> LLC confidential, privileged and private material for the sole use
> of the intended recipient. Any review, copying, or distribution of
> this email (or any attachments thereto) by others is strictly
> prohibited. If you are not the intended recipient, please contact
> the sender immediately and permanently delete the original and any
> copies of this email and any attachments thereto. Thank you.
>
> *From:*RE-wrenches
> [mailto:re-wrenches-bounces at lists.re-wrenches.org
> <mailto:re-wrenches-bounces at lists.re-wrenches.org>] *On Behalf Of
> *Mac Lewis
> *Sent:* Friday, July 17, 2015 10:27 AM
> *To:* RE-wrenches
> *Subject:* [RE-wrenches] Rapid Shutdown
>
> Hi Wrenches,
>
> I am working on a rapid shutdown design with an SMA multi-cluster
> box with 6 x 6048 Sunny Island Inverters, 2 per phase. I will be
> utilizing a Midnite system for some roof top combiners. Is there
> a way to shutdown the Sunny Islands via communication from the
> Midnite rapid shut down box? Or do I need to do shunt-trip
> breakering?
>
> Thanks
>
> Mac Lewis**
>
> "Yo solo sé que no sé nada." *-Sócrates***
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20150717/e75ef79a/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/png
Size: 30736 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20150717/e75ef79a/attachment-0004.png>
More information about the RE-wrenches
mailing list