[RE-wrenches] SINGLE PHASE OUTBACK SYSTEM ON 3 PHASE SERVICE
Bill Turberville
billturb at ece-llc.com
Thu Mar 28 08:23:48 PDT 2013
I know I saw a thread on this but I cannot find it in the archive. I have
inherited a customer that has a four inverter Outback system, 240V 1 Phase,
on a 208Y120V 3 Phase 4 Wire system, that constantly has problems. A 208V
to 240V 1 phase transformer was installed feeding the input, but the system
still struggles. Will this system ever work correctly as is, or does it
need to be rewired for 3 phase and use the third inverter as a spare. This
would include a lot of work rewiring the output panel. Any ideas?
W.C. (Bill) Turberville P.E.
President
ECE Solar
Electrical Contracting Enterprises LLC
3080 Stage Post Road Suite 107
Bartlett, TN 38133
901-348-9230 ext 101 phone
901-348-2192 fax
901-289-6346 cell
billturb at ece-llc.com
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20130328/fead9e71/attachment-0002.html>
More information about the RE-wrenches
mailing list