[RE-wrenches] Pole Mount PVC
Ray Walters
ray at solarray.com
Tue Jan 3 16:00:05 PST 2012
I've only done it that way when some Bozo forgot to install the conduit
in the concrete. Definitely not the preferred method.
Ray
On 1/3/2012 3:19 PM, Drake wrote:
> At 01:48 PM 1/3/2012, you wrote:
>
>> This is a very common way to install this conduit, so I really would
>> like to know how this inspector would route wire from the top of a
>> pole down into a trench while passing through a concrete footer.
>
>
> The instruction was to install the elbow above the footer and run pipe
> along the top of the concrete, then LB into the trench. This was not
> directly told to me by an inspector, but by a NABCEP certified
> installer who said he has been forbidden to run pipe through the
> concrete by "building departments". The theory was that the conduit
> would weaken the anchor.
>
> I've got another pole mount coming up, and wanted to make sure that
> there wasn't something I was missing, possibly from the UBC.
>
> Thanks to all who helped clear this up. I plan to run the pipe
> through the concrete, as always.
>
> Drake
>
> Drake Chamberlin
> ATHENS ELECTRIC LLC
> OH License 44810
> CO license 3773
> NABCEP Certified PV
>
>
> _______________________________________________
> List sponsored by Home Power magazine
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Options& settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules& etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out participant bios:
> www.members.re-wrenches.org
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20120103/e9f76bd2/attachment-0004.html>
More information about the RE-wrenches
mailing list