[RE-wrenches] Point of Connection 705.12D2 Exception

Jeremy Rodriguez- All Solar Inc. allsolar at scswifi.net
Sun Dec 30 16:27:28 PST 2012


I'm concerned that the inspector will not allow a 60A back fed breaker in the 200A main panel as it exceeds the 120% rule
Jeremy
Sent via BlackBerry. Sorry for typos and shorthand!



More information about the RE-wrenches mailing list