[RE-wrenches] Diversion load for AC coupled system

allsolar at scswifi.net allsolar at scswifi.net
Tue Nov 29 17:58:14 PST 2011


How about a Dump Load for the Whisper 500. One for each TS60. We have had good luck with this on our wind gen set up (Skystream) 2.4 kw peak charging betteries
Jeremy
------Original Message------
From: Larry Crutcher,	Starlight Solar Power Systems
Sender: re-wrenches-bounces at lists.re-wrenches.org
To: re-wrenches at lists.re-wrenches.org
ReplyTo: re-wrenches at lists.re-wrenches.org
Subject: [RE-wrenches] Diversion load for AC coupled system
Sent: Nov 29, 2011 6:35 PM

Hello Wrenches,

I would like some advice on diversion load control of 3800 watts of PV solar. The battery bank is 48 volts and the battery inverter is the MS4448PAE. This will AC couple with a grid tied inverter during an outage. Magnum Energy recommends the addition of a dump load for safe battery voltage control.  The customer may leave the home unattended for weeks so I am looking for reliability here. Quality, as well. 

A pair of Tristar 60's should be suitable for the 3.8kW output but I haven't been able to find a load that is sized for this job. I welcome any advice on this subject.  Thanks in advance.

Larry Crutcher
Starlight Solar Power Systems
_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches at lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org



Sent via BlackBerry. Sorry for typos and shorthand!


More information about the RE-wrenches mailing list