[RE-wrenches] PV testing and turn-on /was mechanical vs. electronic kwh meter

Keith Cronin electrichi01 at yahoo.com
Sat Aug 13 11:57:50 PDT 2011


Out here, we usually need to wait, as many meters have been swapped for digital flavored ones.

So, test system and turn off, so client doesn't get a cumulative bill for what they normally use, plus the pv.
 
Aloha,


Keith


________________________________
From: Kirk Herander <kirk at vtsolar.com>
To: 'RE-wrenches' <re-wrenches at lists.re-wrenches.org>
Sent: Saturday, August 13, 2011 8:21 AM
Subject: [RE-wrenches] PV testing and turn-on /was mechanical vs. electronic kwh meter


Another issue I have locally is the utility telling me “you can turn it on to test it, but you can’t leave it on until inspected and the meter is changed out”. That is the extent of their policy. Nothing in writing, which is what I am pushing for. What do other utils nationwide have? Formal maximum turn-on / test / turn-off time periods before inspection? In writing? Or seat of the pants?
 
Kirk Herander
VT Solar, LLC
dba Vermont Solar Engineering
NABCEPTM Certified installer Charter Member
NYSERDA-eligible Installer
VT RE Incentive Program Partner
_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches at lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20110813/3aacc1cf/attachment-0004.html>


More information about the RE-wrenches mailing list