Hi Mark,
The point of operation can be adjusted above normal battery operating
levels, which essentially disables the feature.
Mark
_____________________________________________________________________________________
Mark Edmunds, P.Eng. | Schneider Electric | Renewable Energies
Business | CANADA | Director - Advanced Engineering
Phone: +1-604-422-2609 | Fax: +1-604-420-1591 | Mobile:
+1-604-613-3285
Email: mark.edmunds at schneider-electric.com | Site:
www.schneider-electric.com/renewable-energies | Address: 8999 Nelson
Way, Burnaby, BC, V5A 4B5, Canada
*** Please consider the environment before printing this e-mail
From:
"Mark Frye" <markf at berkeleysolar.com>
To:
"'RE-wrenches'" <re-wrenches at lists.re-wrenches.org>
Date:
04/13/2011 01:47 PM
Subject:
Re: [RE-wrenches] AC Coupling Fronius IG Plus 10.0 inverter
Sent by:
re-wrenches-bounces at lists.re-wrenches.org
I see. Can this function be enabled/diabled?
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
From: re-wrenches-bounces at lists.re-wrenches.org [
mailto:re-wrenches-bounces at lists.re-wrenches.org] On Behalf Of
Mark.Edmunds at schneider-electric.com
Sent: Wednesday, April 13, 2011 1:15 PM
To: RE-wrenches
Cc: re-wrenches-bounces at lists.re-wrenches.org; 'RE-wrenches'
Subject: Re: [RE-wrenches] AC Coupling Fronius IG Plus 10.0 inverter
Hi Mark, Gary,
The Xantrex XW series inverters will do a frequency shift to cause most
models of grid-tied inverter to disconnect when the batteries are full,
while the system is operating in an ac coupled off-grid mode. The
following app-note describes this operation.
Cheers,
Mark
http://www.global-download.schneider-electric.com/852577A4005D7372/all/8FA29D94B918A0FB8525781F0072FCA7/$File/ac-coupling-app-note(976-0240-01-01_rev-a).pdf
_____________________________________________________________________________________
Mark Edmunds, P.Eng. | Schneider Electric | Renewable Energies
Business | CANADA | Director - Advanced Engineering
Phone: +1-604-422-2609 | Fax: +1-604-420-1591 | Mobile:
+1-604-613-3285
Email: mark.edmunds at schneider-electric.com | Site:
www.schneider-electric.com/renewable-energies | Address: 8999 Nelson
Way, Burnaby, BC, V5A 4B5, Canada
*** Please consider the environment before printing this e-mail
From:
"Mark Frye" <markf at berkeleysolar.com>
To:
<Gary at IcarusSolarServices.com>, "'RE-wrenches'"
<re-wrenches at lists.re-wrenches.org>
Date:
04/12/2011 09:37 PM
Subject:
Re: [RE-wrenches] AC Coupling Fronius IG Plus 10.0 inverter
Sent by:
re-wrenches-bounces at lists.re-wrenches.org
Gary,
I have been looking at some AC coupled stuff lately. The "FSC" is
propriatary to SMA, Sunny Island to Sunny Boy. Pretty much anything else
you need something to sense the voltage of the battery bank so you can
open a contactor on the AC line to the Fronius when the battery voltage
gets too high. Once the voltage drops the contactor can close and bring
the Fronius back on line and then the 5-minute start up delay before it is
feeding the line again.
Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City, CA 95959
(530) 401-8024
www.berkeleysolar.com
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20110413/1663a31b/attachment-0004.html>
More information about the RE-wrenches
mailing list