[RE-wrenches] Mounting Enphase when using S-5-PV Clamps
    jay peltz 
    jay at asis.com
       
    Wed Oct 20 10:53:24 PDT 2010
    
    
  
If this helps,
I just installed a system and used 3 different size loop clamps ( del city) which worked really well.
I used 3/8" for single wires, 3/4 for 2 wires and 1" for 3 and also for the connector, worked really well, made it all very clean.
I attached them with SS tek screws into the rails.
jay 
peltz power
On Oct 20, 2010, at 9:40 AM, Mark Dickson wrote:
> Just finished one. . .  Direct Power recommended drilling and bolting directly to the aluminum rails--easy and solid.  Although, I was not happy about all the wire management that went into it though.  Sure would be nice if somebody came along and made some integrated wire raceways!!!
> It was amazing how many blank stares I got from racking manus at SPI, when I asked them if they had any in the works.  Most just kept pointing to their wire clips and pretended not to know about the NEC requirements.
>  
> Best regards,
>  
> Mark Dickson,
> NABCEP Certified Solar PV Installer ™
> Oasis Montana Inc.
>  
> 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org/attachments/20101020/bf8f1cdb/attachment-0003.html>
    
    
More information about the RE-wrenches
mailing list