[RE-wrenches] Code "Authorities"

Brian Crise bcrise at nietc.org
Mon Jun 8 07:53:08 PDT 2009


Gentleman,
I could tell you the reason why the Code panel was disbanded  
(reassigned) by NFPA.  I was on the panel since 2002 and am on the  
current 2011 CMP #4.  Panel 13 had jurisdiction over several articles  
including PV.  Two of the issues (Article 695, Fire Pumps, and Article  
700, Emergency Systems) had contentious issues with them.  Article 695  
was an attempt at a complete rewrite that didn't go over to well.   
Article 700, in particular, 700.27 dealing with selective coordination  
was a very heated issue.  The panel was nearly split down the middle  
every time we meet over those issues.  After Panel 13's articles were  
reassigned, I was asked by my sponsor to again sit on Panel #4 which  
has Article 690, 692 and now possibly 694, (Wind systems).  My opinion  
was that Article 690 wasn't the cause of Panel 13's reassignment.
Regards,
Brian

NABCEP Certified PV Installer
Oregon General Supervising Electrician #5156S
Oregon Electrical Inspector "A" Level certificate
Member of NEC CMP 4

To contact Brian L Crise:

Address:
16021 NE Airport Way
Portland OR, 97230

Office Phone:    (503) 262-9991 x.5054

e-mail:    bcrise at nietc.org

On Jun 7, 2009, at 3:39 PM, William Miller wrote:

> Dick, colleagues:
>
> I was at a seminar in which John Wiles lectured building officials  
> and installing contractors.  At one point I asked about 690.31(E)  
> (2005).  Mr. Wiles glibly commented that the restriction of that  
> section to utility-interactive systems was a "typo" in the 2005  
> edition.  There were many officials present that inspect and plan- 
> check my work.  Based on Mr. Wiles remark, several inspectors have  
> been trying to apply 690.31(E) to off-grid systems.  This has cost  
> me time, money and aggravation.
>
> Mr. Wiles apparently does not know the responsibility he has when he  
> makes off-hand remarks.  His opinion that a given passage in the  
> code is not correct does not negate what is in black and white.   
> With all due respect, I wish he would be a bit more temperate in his  
> remarks.
>
> Sincerely,
>
> William Miller
>
> PS:  Mr. Wiles showed slides of his home installation.  It may be a  
> code complaint installation, but there is nothing pretty about the  
> workmanship.  I think a thorough familiarity with the code does not  
> alone comprise a complete education on PV installation.
>
> Wm
>
>
>
>
>
> At 10:07 AM 6/7/2009, you wrote:
>> According to John Wiles, the code making panel for 2008 Article 690  
>> was
>> disbanded
>> by the NFPA because it, "violated NEC code developement procedures  
>> and because
>> of other issues." Doesn't leave one with much confidence in their  
>> work.
>>
>>
>> Dick Ratico
>> Solarwind Electric
>> Bradford, VT
> _______________________________________________
> List sponsored by Home Power magazine
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Options & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out participant bios:
> www.members.re-wrenches.org
>

-------------- next part --------------