[RE-wrenches] trouble shooting system with Sun Tie
    Mark Edmunds 
    mark.edmunds at xantrex.com
       
    Mon Sep 15 17:43:47 PDT 2008
    
    
  
Hi Jay,
Interesting feedback on the micro hydro use... we have never tested a GT
with that type of input. Tracking is very fast and stable with PV -
though I have to admit we never considered operating directly from a
micro hydro generator when we did the design!
Cheers,
Mark
Mark Edmunds
Xantrex Technology Inc.
-----Original Message-----
From: re-wrenches-bounces at lists.re-wrenches.org
[mailto:re-wrenches-bounces at lists.re-wrenches.org] On Behalf Of jay
peltz
Sent: Monday, September 15, 2008 12:57 PM
To: RE-wrenches
Subject: Re: [RE-wrenches] trouble shooting system with Sun Tie
Hi Dana,
I've got a old GT that I'm using for a grid-tie micro hydro.
This unit takes 5 hours to track any changes to the turbine ( nozzle  
changes or startup), amazing.
In comparison, a SMA 2500 takes about 30 seconds.
jay
peltz power
    
    
More information about the RE-wrenches
mailing list