Power generated is power supplied to the back up sub panel and any excess
generation delivered to the grid. The power to the sub panel is not only
supplied when the grid is down. When the grid is up the inverter's xfer switch
feeds grid power to these loads as well. (In my home this is all 120 volt
loads.) Not metering this feed would result in a highly inaccurate measurement
of PV power being generated.

Todd


Kelly Keilwitz wrote:

> Hi Jeff,
> Yes, in order to completely measure all of the RE AC output from the system
> the throughput to the subpanel loads should also be measured. However,
> since these systems are battery backup for a few loads where the grid might
> normally be down for 24 hours per year I disagree that the power to the
> subpanel is substantial (in these cases). The benefit in accuracy doesn't
> seem worth the extra cost and complexity of metering the subpanel AC output
> in addition to the grid AC out/input from the inverter to me.

- - - -
To send a message: RE-wrenches at topica.com

Archive of previous messages: http://www.topica.com/lists/RE-wrenches/

List rules & etiquette: http://www.mrsharkey.com/wrenches/etiquete.htm

Check out participant bios: www.mrsharkey.com/wrenches/index.html

Hosted by Home Power magazine

Moderator: michael.welch at homepower.com
--^----------------------------------------------------------------
This email was sent to: michael.welch at homepower.com

EASY UNSUBSCRIBE click here: http://topica.com/u/?bz8Qcs.bz9JC9.bWljaGFl
Or send an email to: RE-wrenches-unsubscribe at topica.com

TOPICA - Start your own email discussion group. FREE!
http://www.topica.com/partner/tag02/create/index2.html
--^----------------------------------------------------------------






More information about the RE-wrenches mailing list