[RE-wrenches] Different question about wires between arrays
Sam Haraldson
sam at onsiteenergyinc.com
Wed Mar 23 10:28:46 EDT 2022
*> My question is, can you run EMT above ground on say 4” concrete blocks(
like on a roof) between the back array and the inverter which is at the
front array?*
I have found in follow up inspections at a site where we did this that the
concrete blocks tend to move around a bit over time (presumably from
melt/thaw of ice and snow) but it has protected the conductors well and it
obviously passed inspection. The site where we did this was built on top
of a concrete pad which we obviously couldn't trench into. The entire
property this is located on is access-controlled and is staffed 24 hours a
day so nuisance interactions are not a safety concern otherwise this may
have been sub-optimal.
Sincerely,
Sam Haraldson <sam at onsiteenergyinc.com>
Installation & Service Manager
<http://www.onsiteenergyinc.com/>
| o. (406) 551-6135
<https://www.facebook.com/onsiteenergysolar/>
<https://www.instagram.com/onsiteenergyinc/>
<https://twitter.com/onsiteenergyinc>
<https://www.linkedin.com/company/onsite-energy-inc/>
<https://onsiteenergyinc.com/bcorp>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20220323/d6cb987e/attachment.htm>
More information about the RE-Wrenches