[RE-wrenches] Disconnect spacing
frenergy
frenergy at psln.com
Thu Mar 12 10:27:30 EDT 2020
Of course then there is the "bottom line", final say approval determined
by the AHJ which might be hard for this inspector to refuse your
clearances when he/she is asked to operate that switch and see that
there is zero issue with its safe and easy operation. AHJ's are allowed
to use common sense.
Bill
Feather River Solar Electric
Bill Battagin, Owner
4291 Nelson St.
Taylorsville, CA 95983
530.284.7849
CA Lic 874049
www.frenergy.net
On 3/11/2020 3:03 PM, Jason Szumlanski wrote:
> I'm meeting him tomorrow. He tells me it's too close but I can't get
> him to tell me what an acceptable distance would be. It's totally
> insane. I was pretty sure there was nothing in the NEC about this
> specifically, but I wanted to make sure before I asked him to cite a
> code reference in his rejection letter so I could appeal it to the chief.
>
> *
>
> *
>
>
> On Wed, Mar 11, 2020 at 5:52 PM Chris Sparadeo
> <sparadeo.chris at gmail.com <mailto:sparadeo.chris at gmail.com>> wrote:
>
> I've looked through Article 110 and even UL listings for GE
> disconnects and there is no specific code of reference to minimum
> space about the component (other than typical working space
> requirements). Ask your AHJ to point to a code reference...
>
> On Wed, Mar 11, 2020 at 4:42 PM Jeff Clearwater
> <jeffc at villagepowerdesign.com
> <mailto:jeffc at villagepowerdesign.com>> wrote:
>
> Yes, what others said - my understanding is that as long as
> the door can open 90º then it's considered not in the way of
> working space.
>
> Jeff Clearwater
>
>
--
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20200312/9bada862/attachment.htm>
More information about the RE-Wrenches
mailing list