[RE-wrenches] Solar set backs
Christopher Warfel
cwarfel at entech-engineering.com
Wed Jan 15 02:07:14 EST 2020
The setbacks you noted are similar to those in NY. There are exceptions
to the setbacks based upon alternative access to the roof. These are
amendments to the NY Building Code, which amended the IBC/IFC regarding
this aspect of solar installations. Email me off list if you would like
slides from a PPT presentation we created on this topic. Chris
On 1/14/2020 12:11 PM, Martin Herzfeld wrote:
> Simply, an emphasis is now also on the location of ESSs in
> non-habitable and habitable spaces and the size in kWh.
>
> BTW, I attended a day of of a two day free IAFF Conference in
> California announced through the IAEI, with UL found here:
> https://connect.ul.com/meeting-challenges-of-built-environment-sacramento.html#meetingagenda
>
>
> All the best,
>
> Martin Herzfeld, Interstate Renewable Energy Council (IREC) Certified
> Master Trainer ™ for Photovoltaics (PV) Installation Professional
> #IREC 10037
> https://www.youracclaim.com/badges/a54a49a9-31cb-4f52-b35f-9d7c90630bb9/public_url
> Adjunct Professor, Energy, American River College
> Contract Training Provider (CTP)
>
> California Solar & Electrical Contractor License #00833782 C46, C10,
> D56, D31, C-7
> Solar, Electrical, Trenching, Pole Installation & Maintenance,
> Instrumentation
>
> Contract Solar (PV) Technical Inspector - 3rd Party Inspections
> Underwriters Laboratories (UL) Certified PV Installer #17, OSHA 30
> OSHA-Authorized Construction Trainer #32-0105338
> CompTIA Certified Technical Classroom Trainer (CTT+) #T3NSZCNBBKB4QTQG
>
> * Professional Member, International Association of Electrical Inspectors
> * Accredited and Registered North American Board of Certified Energy
> Practitioners (NABCEP) Continuing Education (CE) Provider
> On Tue, Jul 10, 2018, 2:38 PM Wayne Irwin <PureEnergySolar at hotmail.com
> <mailto:PureEnergySolar at hotmail.com>> wrote:
>
> Calfire code seems to be the standard being somewhat enforced as
> the standard nationwide.
>
> Wayne Irwin,
> President
> License #CVC56695
> State Licensed Solar Contractor
> Pure Energy Solar International Inc.
> Wayne at PureEnergySolar.com
> http://PureEnergySolar.com
> http://SolarChargingStation.net
> 352 377-6527 Office
> 352 336-3299 Fax
>
>
> The Sun Is Always Shining!
>
> The content of this message is Pure Energy Solar Confidential. If
> you are not the intended recipient and have received this message
> in error, any use or distribution is prohibited. Please notify me
> immediately by reply e-mail and delete this message from your
> computer system. Thank you.
> ------------------------------------------------------------------------
> *From:* RE-wrenches <re-wrenches-bounces at lists.re-wrenches.org
> <mailto:re-wrenches-bounces at lists.re-wrenches.org>> on behalf of
> Daniel Young <dyoung at dovetailsolar.com
> <mailto:dyoung at dovetailsolar.com>>
> *Sent:* Tuesday, July 10, 2018 5:25:01 PM
> *To:* 'RE-wrenches'
> *Subject:* Re: [RE-wrenches] Solar set backs
>
> Hey Gary,
>
> Ohio Fire Code does cover this. It’s a matter of if the Fire
> marshal in you project area wants to waive or alter the requirements.
>
> http://codes.ohio.gov/oac/1301:7-7-06v1
>
> Specifically 605.11.1.2 is for residential buildings. There is
> some conflict in terms of Hip roofs in the code there.
> 605.11.1.2.2 states a single 3ft path on one edge or another for a
> hip roof, but 605.11.1.2.4 states that an 18 space is allowed when
> modules are mounted on two adjacent roof planes with a hip roof.
>
> With Regards,
>
> Daniel Young,
>
> NABCEP Certified PV Installation Professional^TM : Cert #031508-90
>
> *From:* RE-wrenches <re-wrenches-bounces at lists.re-wrenches.org
> <mailto:re-wrenches-bounces at lists.re-wrenches.org>> *On Behalf Of
> *gary easton
> *Sent:* Monday, July 09, 2018 3:39 PM
> *To:* RE-wrenches <re-wrenches at lists.re-wrenches.org
> <mailto:re-wrenches at lists.re-wrenches.org>>
> *Subject:* [RE-wrenches] Solar set backs
>
> Hello Wrenches,
>
> What are you all seeing required as setbacks post 2017? I am
> having inspectors vary between wanting a 3' lane at the bottom and
> sides to allowing the array down to the gutter, and from requiring
> between 18" and 3' at the ridge.
>
> --
>
> Gary Easton
> Appalachian Renewable Power
>
> Stewart, Ohio 45778
> NABCEP Certified Solar PV
> T: 740-277-8498
>
> www.arp-solar.com <http://www.arp-solar.com>
>
>
> “First they ignore you. Then they laugh at you. Then they fight
> you. Then you win.”
>
> ~Ghandi
>
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches at lists.re-wrenches.org
> <mailto:RE-wrenches at lists.re-wrenches.org>
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive:
> http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
> <http://www.re-wrenches.org/etiquette.htm>
>
> Check out or update participant bios:
> www.members.re-wrenches.org <http://www.members.re-wrenches.org>
>
>
>
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> www.members.re-wrenches.org
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20200115/e47a1072/attachment.htm>
More information about the RE-Wrenches
mailing list