[RE-wrenches] Large off-grid inverter/storage
Dave Angelini Offgrid Solar
offgridsolar at sti.net
Fri Sep 6 10:52:21 EDT 2019
Last time I looked, victron was not UL and you needed 2 of them for
split phase. Am I wrong?
Dave Angelini Offgrid Solar
"we go where
powerlines don't"
http://members.sti.net/offgridsolar/ [1]
e-mail
offgridsolar at sti.net [2]
text 209 813 0060
On Fri, 6 Sep 2019 07:17:32
-0400, Tump wrote: Victron has 10kW/120/100A pass thru, inverters and do
your self a favor, buy individual 2 volt batteries. Cells DO GO BAD and
replacing a cell in a HUPs battery is a CF. AND they really are a pain to
install.
On Sep 5, 2019, at 10:50 PM, David Katz wrote:
The
sentence "25KW per hour" does not make sense. Do they mean 25KWh per hour?
That would be 600 KWh per day! That would require over 200KW of PV. David
Katz
On Thu, Sep 5, 2019 at 3:33 PM Dave Angelini Offgrid Solar wrote:
I often find that numbers like 25KW per hour are just overblown and the
rest of the Offgrid load power data is too high.
Offgrid is all about the
state of the art in not needing high power levels by using the best
equipment available for the loads.
One can't simply take a power bill
from a utility and try to duplicate it offgrid. The loads have to be
reduced drastically.
Maybe this is not the case here and if so I
digress. Good Luck
Dave Angelini Offgrid Solar
"we go where powerlines
don't"
http://members.sti.net/offgridsolar/ [5]
e-mail offgridsolar at sti.net
[6]
text 209 813 0060
On Thu, 5 Sep 2019 16:16:27 -0600, "Dana" wrote:
You will have to park the 'Package' somewhere... Yeah off grid takes
space & WLA batteries like to be warm in the winter ">Basements? Dedicated
building? Storage container [insulated]?
Radiant floors make for happy
batteries. Cool in summer ">
Dana Orzel Great Solar Works, Inc.
C - 208.721.7003
Idaho Contractor - # 028765 Idaho PV # 028374
NABCEP # 051112-136 www.solarwork.com [8]
"Responsible Technologies for
Responsible People since 1988"
P Please consider the environment before
printing this email.
FROM: RE-wrenches ON BEHALF OF Andrew
SENT:
Thursday, September 05, 2019 3:15 PM
TO: RE-wrenches
SUBJECT:
[RE-wrenches] Large off-grid inverter/storage
Hey Everyone,
I have
been recently been getting more and more inquiries for some quite large
off-grid sytems(25kw per hour) and seeing what you guys have for
suggestions on bigger inverters and storage systems? I could do 2 triple
stack Schneider's and a bunch of HUPS industrial batteries but it all just
takes up so much space and I know there are some other companies out there
with package units. Thoughts?
Andrew Perkins
Greenwired
P:
707-923-2001 ext. 100
1150 #1 Evergreen Rd
Redway, CA 95560
www.greenwired.com [11]
--
_______________________________________________
List sponsored by Redwood
Alliance
List Address: RE-wrenches at lists.re-wrenches.org [12]
Change
listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org [13]
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
[14]
List rules & etiquette:
www.re-wrenches.org/etiquette.htm [15]
Check out or update participant bios:
www.members.re-wrenches.org [16]
--
David Katz Sent from Gmail Mobile
_______________________________________________
List sponsored by Redwood
Alliance
List Address: RE-wrenches at lists.re-wrenches.org [17]
Change
listserver email address &
settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
[18]
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
List
rules border-left:#1010ff 2px solid; margin-left:5px; width:100%">
WWW.SWNL.NET [19] Solarwinds Northernlights _ _ _ SERVING MID COAST
MAINE ">
_ 207-832-7574 CL. 610-517-8401 _ _ __BLAIR "TUMP" MAY_
******** MAINE'S CHARTER ********
_ __ NABCEP "CERTIFIED PV INSTALLER"_
******** MAINE'S CHARTER ********
_ TRACE XANTREX "CERTIFIED" DEALER /
INSTALLER"_ --
Links:
------
[1]
http://members.sti.net/offgridsolar/
[2] mailto:offgridsolar at sti.net
[3]
mailto:dkatz at backwoodssolar.com
[4] mailto:offgridsolar at sti.net
[5]
http://members.sti.net/offgridsolar/
[6] mailto:offgridsolar at sti.net
[7]
mailto:dana at solarwork.com
[8] http://www.solarwork.com/
[9]
mailto:re-wrenches-bounces at lists.re-wrenches.org
[10]
mailto:re-wrenches at lists.re-wrenches.org
[11]
http://www.greenwired.com/
[12]
mailto:RE-wrenches at lists.re-wrenches.org
[13]
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
[14]
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
[15]
http://www.re-wrenches.org/etiquette.htm
[16]
http://www.members.re-wrenches.org/
[17]
mailto:RE-wrenches at lists.re-wrenches.org
[18]
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
[19]
http://webmail.sti.net/blocked::http://www.swnl.net/%22%20%5Co%20%22blocked::http://www.swnl.net/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20190906/b52d8b5f/attachment.htm>
More information about the RE-Wrenches
mailing list