[RE-wrenches] Schneider ac coupling time.
jay
jay.peltz at gmail.com
Tue Jun 4 21:29:45 EDT 2019
HI All,
I’ve got a project using lithium batteries and a big hydro.
4kw hydro
6.8kw schneider
off grid
AC coupled hydro
The plan is to use a combination of ways to keep from overcharging the batteries.
1. PWM diversion control load. If this doesn’t keep up then we go to #2
2. AC couple HZ control and if that fails we go to #3
3. SS relay control on GT inverter output via inverter control
My question is this: Does anyone know the time between when the XW+ sees the voltage and then gets to the 64hz for regulation?
thanks
jay
peltz power
More information about the RE-Wrenches
mailing list