Bill
My customer alarm just went off. This potential client is putting in a comm site at 7000’ and is concerned about the *cost* of an inverter? I can understand the desire for reliability, and so going for direct DC. But given the logistics and engineering of a high altitude remote site I’d be cautious about doing a job for someone penny pinching on an inverter.
Not exactly the advice you were asking for, but it jumped out at me.
Hilton
Hilton Dier III
Renewable Energy Design
Missisquoi River Hydro LLC
More information about the RE-Wrenches