[RE-wrenches] Rapid Shutdown and January 1 2019 option?

cwarfel cwarfel at entech-engineering.com
Fri Jul 6 11:55:56 EDT 2018


I am wondering about the experience installers have with a DC coupled 
multimode system design that will comply after January 1 with what I 
feel is the biggest mistake/poorly guided part of NEC 2017 690, and that 
is 690.12. We are installing two Outback systems with the remote 
controlled combiner and even that won't comply after January 1 unless we 
parallel more subarrays (There's safety for you, lower voltage-higher 
amperage!). Thanks for any insight.

Chris




-- 

          Christopher Warfel, PE
        ENTECH Engineering, Inc.
PO Box 871, Block Island, RI 02807
                (401)466-8978

EEI logo <http://entech-engineering.com>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20180706/df1c7aa3/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: EEIlogolong.jpg
Type: image/jpeg
Size: 17117 bytes
Desc: not available
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20180706/df1c7aa3/attachment.jpg>


More information about the RE-Wrenches mailing list