[RE-wrenches] Looking for insulated #6 bare standoff
whitley forman
whitleyforman at yahoo.com
Wed Apr 18 17:23:06 EDT 2018
You should not have to run a EGC/GEC along the with Array Technologies. When I have installed these in the past we always mechanically bond within the bicinity of the conduit or box we are running our wiring through. No need to non-mechanically attach anywhere.
Whitley Forman Bannon Specialty Electric Systems whitley at bannonses.com
Sent from Yahoo Mail on Android
On Wed, Apr 18, 2018 at 5:01 PM, re-wrenches-request at lists.re-wrenches.org<re-wrenches-request at lists.re-wrenches.org> wrote: Send RE-wrenches mailing list submissions to
re-wrenches at lists.re-wrenches.org
To subscribe or unsubscribe via the World Wide Web, visit
http://lists.re-wrenches.org/listinfo.cgi/re-wrenches-re-wrenches.org
or, via email, send a message with subject or body 'help' to
re-wrenches-request at lists.re-wrenches.org
You can reach the person managing the list at
re-wrenches-owner at lists.re-wrenches.org
When replying, please edit your Subject line so it is more specific
than "Re: Contents of RE-wrenches digest..."
When responding to posts within the Digest, be sure to restore the Subject: line to the original, and please edit out any extraneous lines from the quoted message.
Today's Topics:
1. Re: Looking for insulated #6 bare standoff
(Dave Angelini Offgrid Solar)
----------------------------------------------------------------------
Message: 1
Date: Wed, 18 Apr 2018 09:59:02 -0700 (PDT)
From: "Dave Angelini Offgrid Solar" <offgridsolar at sti.net>
To: "RE-wrenches" <re-wrenches at lists.re-wrenches.org>
Subject: Re: [RE-wrenches] Looking for insulated #6 bare standoff
Message-ID:
<4244e49bbfd7bc5c2bb987b9429ff48f.squirrel at webmail.sti.net>
Content-Type: text/plain;charset=iso-8859-1
Why is it #6? Usually the solar panels wire size determine Array Teks size
for this wiring. What do they say please? --Dave
> How about an insulated loop clamp like this one:
> https://www.fastenal.com/products/details/0216763
>
> You can get them in stainless and they have the rubber grommet so it won't
> touch the rack.
>
> On Wed, Apr 18, 2018 at 12:00 PM, Dana <dana at solarwork.com> wrote:
>
>> Good Morning Wrenches,
>>
>>
>>
>> I am required to keep the bare #6 copper from touching the aluminum
>> frame
>> work of a Array Technologies tracker where it is not mechanically
>> connected
>> by a pass-through ground clamp on a tracking array [dissimilar metals]
>> and
>> am looking for a lead on an insulated standoff or strap to hold the #6
>> bare
>> copper as it passes from panel to panel and rail to rail. The plans
>> examiner would accept pass through clamps & this is a worst case-spendy
>> solution to this.
>>
>>
>>
>> I have searched the inquired at local electrical warehouse &on the
>> internet and to no avail under ???insulated strap??? & ???insulated
>> cable
>> standoff???.
>>
>>
>>
>> Has anyone else encountered his & what did you use? Where did you source
>> this strap?
>>
>>
>>
>> I remember seeing something like this in the fuzzy past & cannot recall
>> where I saw it or what it was for.
>>
>>
>>
>> Thanks for any suggestions.
>>
>>
>>
>> ------------------------------------------------------------
>> ----------------
>>
>> Dana Orzel Great Solar Works, Inc.
>>
>> *C - 208.721.7003 dana at solarwork.com
>> <dana at solarwork.com>*
>>
>> Idaho Contractor - # 028765 Idaho PV # 028374
>>
>> NABCEP # 051112-136 www.solarwork.biz
>>
>> *"Responsible Technologies for Responsible People since 1988" *
>>
>> *P* Please consider the environment before printing this email.
>>
>>
>>
>>
>>
>> _______________________________________________
>> List sponsored by Redwood Alliance
>>
>> List Address: RE-wrenches at lists.re-wrenches.org
>>
>> Change listserver email address & settings:
>> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>>
>> List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.
>> org/maillist.html
>>
>> List rules & etiquette:
>> www.re-wrenches.org/etiquette.htm
>>
>> Check out or update participant bios:
>> www.members.re-wrenches.org
>>
>>
>>
>
>
> --
> *Will White*
> Curriculum Developer
>
> [image: Inline image 3]
>
> e: will at solarenergy.org
> w: www.solarenergy.org
> p: 802-272-3092
>
> PV Installation Professional
> # 093006-34
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive:
> http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> www.members.re-wrenches.org
>
>
Dave Angelini Offgrid Solar
"we go where powerlines don't"
http://members.sti.net/offgridsolar/
e-mail offgridsolar at sti.net
text 209 813 0060
------------------------------
Subject: Digest Footer
_______________________________________________
List sponsored by Redwood Alliance
List Address: RE-wrenches at lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org
------------------------------
End of RE-wrenches Digest, Vol 11, Issue 137
********************************************
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20180418/6936380d/attachment.htm>
More information about the RE-Wrenches
mailing list