[RE-wrenches] MIXING ENPHASE M-2XX / IQ6 MICROS & ENVOY / IQ-ENVOY ON SAME AC COMBINER LOAD CENTER
Gary Willett
Gary at IcarusSolarServices.com
Wed Nov 29 07:06:07 EST 2017
Thanks Nick!
So we will need two Envoys, which is what I expected.
My question # 5 again. Will the Enlighten software monitoring portal
aggregate all 64 Enphase micros into a single unified production view,
or will two separate production views (48 existing M215s; 16 new IQ6s)
be required for the same site?
Best regards,
Gary Willett PE
Icarus Engineering / Solar Services LLC
Irving TX
On 11/28/17 8:30 PM, Nick Soleil wrote:
> Enphase does allow an IQ Envoy and an older Envoy (Envoy-S or earlier) on the same site. We were initially conservative and didn't officially recommend it, but have removed that wording from our IQ Microinverter datasheet and from our trainings.
>
>
> The new IQ Envoy won't talk to the M and S-series micros (and vice-versa), so you will need two Envoys, one of them being an IQ Envoy.
>
>
> Cordially,
>
> Nick Soleil
>
> Enphase Energy | Product Manager, Envoy and IQ Accessories
>
>
> (707) 763-4784 x7267 // office
>
> (707) 321-2937 // cell
>
> [Enphase_esig_logo6.jpg]<https://enphase.com/>
>
>
> Energy Evolved<http://enphase.com>â„¢
>
> Powering What’s Next™ | The Enphase Energy Management System<http://ow.ly/HbVS3>
>
>
> NABCEP Certified Solar PV Installer #03262011-300
>
> California C10 Licensed Electrician #986315
>
> Texas Master Electrician #284451
>
>
>
>
> ________________________________
> From: RE-wrenches <re-wrenches-bounces at lists.re-wrenches.org> on behalf of Jason Szumlanski <jason at floridasolardesigngroup.com>
> Sent: Tuesday, November 28, 2017 4:49 PM
> To: RE-wrenches
> Subject: Re: [RE-wrenches] MIXING ENPHASE M-2XX / IQ6 MICROS & ENVOY / IQ-ENVOY ON SAME AC COMBINER LOAD CENTER
>
> Although Enphase recommends against it I believe (mixing generations at
> this time), in theory you need one ACCP, two Envoys (one of each type), and
> you can aggregate into a single portal system (just add the second Envoy to
> the activation). I think the mixing of systems is not recommended due to
> potential communication interference.
>
> From what I understand they are launching an IQ Envoy that will handle both
> systems in the future, but they are not there yet.
>
> I'm actually sourcing some M250's at this moment to add to a M215 system
> for a client. I wanted to avoid the whole IQ issue and let someone else be
> the guinea pig, so let us know what results you have! :)
>
> We are about to have hundreds of homes with a mix of some with M series and
> some with IQ series in very close proximity. This should be interesting!
> But I don't expect any major issues home to home. The first IQ systems are
> not showing any issues yet.
>
>
> Jason Szumlanski
>
>
>
>
> On Mon, Nov 27, 2017 at 8:27 PM, Gary Willett <Gary at icarussolarservices.com>
> wrote:
>
>> ESTEEMED WRENCHES:
>> I'm in the process of engineering a project to add 16 new Enphase IQ6
>> micros to an existing 48 Enphase M215-IG system that has been
>> in-service about 2 years.
>> The original system has a NEMA-3R outdoor AC Combiner Panel (ACCP) with
>> each of the (3) M215 AC strings landing on a separate 2-pole 20A
>> circuit breaker.
>> The Enlighten Envoy is mounted in a NEMA-4 plastic enclosure below the
>> ACCP, and is powered by a 1-pole 15A breaker in the ACCP.
>> My intent is to land the new 16-IQ6 string on a new 20A breaker in the
>> ACCP, and to power its Envoy (if needed) also from the ACCP.
>> In studying Enphase documents:
>>
>> (A) IQ6 micros have to be monitored by an IQ-Envoy.
>> (B) Envoy uses a 1-pole "L1, "N", and "EGC" a dedicated NEMA-5R
>> receptacle branch circuit for power supply and its AC comms modem.
>> (C) IQ-Envoy uses "L1, "L2, and "N", for power supply and its AC
>> comms modem, and is wired directly to its dedicated 2-pole breaker.
>>
>> My questions:
>>
>> 1. Can I replace the existing Envoy with a new IQ-Envoy, and monitor
>> the all 64 micros (48 existing M215s; 16 new IQ6s) with the new
>> IQ-Envoy?
>> 2. If the answer to "1" is yes, that's what I would like to do.
>> 3. If the answer to "1" is no, can I still land the new IQ6 string
>> on the existing ACCP, or do I need to place another ACCP just for
>> the new IQ6 string and any future growth?
>> 4. If the answer to "1" is no, can the existing Envoy and the new
>> IQ-Envoy both be powered from the same ACCP?
>> 5. If both the existing Envoy and the new IQ-Envoy can co-exist at
>> the same customer site, will the Enlighten software monitoring
>> portal aggregate all 64 Enphase micros into a single unified
>> production view, or will two separate production views be required?
>>
>> Thanks for your help!
>> Gary Willett PE
>> Icarus Engineering / Solar Services LLC
>> Irving TX
>> _______________________________________________
>> List sponsored by Redwood Alliance
>>
>> List Address: RE-wrenches at lists.re-wrenches.org
>>
>> Change listserver email address & settings:
>> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>> <https://mailtrack.io/trace/link/2d50e8d87317466f2604245c61148c13af5cc414?url=http%3A%2F%2Flists.re-wrenches.org%2Foptions.cgi%2Fre-wrenches-re-wrenches.org&userId=1613865&signature=161b5623c16b2865>
>>
>> List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.
>> org/maillist.html
>> <https://mailtrack.io/trace/link/b8a84a64125069221e3e48e116f5ad05801cc108?url=http%3A%2F%2Fwww.mail-archive.com%2Fre-wrenches%40lists.re-wrenches.org%2Fmaillist.html&userId=1613865&signature=030d43d59a94d35b>
>>
>> List rules & etiquette:
>> www.re-wrenches.org/etiquette.htm<http://www.re-wrenches.org/etiquette.htm>
>> <https://mailtrack.io/trace/link/86bec64039d1bb115d11bc42873dacff577a5ec4?url=http%3A%2F%2Fwww.re-wrenches.org%2Fetiquette.htm&userId=1613865&signature=f74c76c512dc25db>
>>
>> Check out or update participant bios:
>> www.members.re-wrenches.org<http://www.members.re-wrenches.org>
>> <https://mailtrack.io/trace/link/7b88e6ec3c56f7b53523ca6c284c14755dcb3bdf?url=http%3A%2F%2Fwww.members.re-wrenches.org&userId=1613865&signature=7f1e004f60256ca4>
>>
>>
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm<http://www.re-wrenches.org/etiquette.htm>
>
> Check out or update participant bios:
> www.members.re-wrenches.org<http://www.members.re-wrenches.org>
>
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: RE-wrenches at lists.re-wrenches.org
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> www.members.re-wrenches.org
>
>
More information about the RE-Wrenches
mailing list