[RE-wrenches] Grid Tie, battery back-up, feed in tarriff

Bill Turberville billturb at ece-llc.com
Tue Jul 2 11:41:17 EDT 2013


Does anyone have an one-line diagram for a grid-tie, battery back-up, for a
feed in tariff (in the TVA service area)?  I have used a-c coupled in areas
where there is net-metering, but TVA requires that there is a separate
Generation meter, tied ahead for the service.





William C. Turberville P.E.

President

ECE Solar

Electrical Contracting Enterprises LLC

3080 Stage Post Dr ste 107

Bartlett, TN 38133

901-348-9230 ext 101 phone

901-289-6346 cell

901-348-2192 FAX
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.re-wrenches.org/pipermail/re-wrenches_lists.re-wrenches.org/attachments/20130702/e81a0548/attachment.htm>


More information about the RE-Wrenches mailing list