<div dir="ltr">All,<div>Has anyone ever mounted MLEs (optimizers, microinverters, RSDs) on the perimeter of the array or elsewhere instead of underneath the PV module?</div><div><br></div><div>I never was a fan of climbing up on a pitched roof and removing modules to replace the electronics. And with a recent knee replacement, I won&#39;t be providing this service again.</div><div><br></div><div>In post-surgery downtime this simple idea surfaced. My next job if it&#39;s practical is to create jumper module cables to extend down to the electronics, mounted just outside the array on their own rail. Then create a good-looking TBD cover to shield the MLEs from direct sunlight, snow, etc.</div><div><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt"><a name="SignatureSanitizer__MailAutoSig"><b>Kirk Herander / </b></a><b><a href="mailto:kirkh@vermont.solar" title="Send an email to kirkh@vermont.solar; Send an email to kirkh@vermont.solar" style="color:blue" target="_blank">kirkh@vermont.solar</a></b></span></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt"><b>Owner|Principal, VT Solar, LLC</b></span></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt"><b><i>Celebrating our 32<sup>st</sup> Anniversary 1991-2023!!</i></b></span></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt">dba Vermont Solar Engineering</span><br></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt">802.863.1202</span></p></div></div></div></div>