<div dir="auto">I have an off grid system with three GS8048A inverters. <div dir="auto">Every time it switches from generator charging to inverting - at the end of absorption - the lights flicker and a propane boiler in the house goes into fault. </div><div dir="auto">I&#39;m using Advanced AGS on the Mate3S.</div><div dir="auto"><br></div><div dir="auto">The loads don&#39;t exceed about 6 kW right now.</div><div dir="auto"><br></div><div dir="auto">Does anyone know if there&#39;s a way to reduce the transfer time? The transition to charging is smooth. I don&#39;t understand why it&#39;s so clunky transitioning back to inverting.</div><div dir="auto"><br></div><div dir="auto"><br><div data-smartmail="gmail_signature" dir="auto">Eric Smiley<br>Project Manager, North Island<br><br>E:  <a href="mailto:eric@vecoop.ca">eric@vecoop.ca</a><br>T:  1-888-386-0116 ext 702 (toll free)<br>C:  250-703-6004<br>W:  <a href="http://viridianenergy.ca">viridianenergy.ca</a></div></div></div>