<div dir="auto">Does anyone know if you can use the Smart Switch as a simple service disconnect if not installing solar and batteries now and have it work out of the box without any commissioning?<div dir="auto"><br></div><div dir="auto">I have a client building a new house and they are going to add solar and batteries after the certificate of occupancy is issued. I want to get the Smart switch installed as a service disconnect so I don&#39;t have to pull the meter later. I assume I can trust use the load side lugs to feed the main distribution panel in the home.</div><div dir="auto"><br></div><div dir="auto">Jason Szumlanski</div><div dir="auto">Florida Solar Design Group</div></div>