<html><head><meta http-equiv="Content-Type" content="text/html; charset=utf-8"><meta name="Generator" content="Microsoft Word 14 (filtered medium)"><style><!--
/* Font Definitions */
@font-face
{font-family:Calibri;
panose-1:2 15 5 2 2 2 4 3 2 4;}
@font-face
{font-family:Tahoma;
panose-1:2 11 6 4 3 5 4 4 2 4;}
@font-face
{font-family:Verdana;
panose-1:2 11 6 4 3 5 4 4 2 4;}
@font-face
{font-family:"Segoe UI Symbol";
panose-1:2 11 5 2 4 2 4 2 2 3;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
{margin:0in;
margin-bottom:.0001pt;
font-size:11.0pt;
font-family:"Calibri","sans-serif";}
a:link, span.MsoHyperlink
{mso-style-priority:99;
color:blue;
text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
{mso-style-priority:99;
color:purple;
text-decoration:underline;}
span.EmailStyle17
{mso-style-type:personal;
font-family:"Verdana","sans-serif";
color:windowtext;}
span.EmailStyle18
{mso-style-type:personal-reply;
font-family:"Verdana","sans-serif";
color:#1F497D;}
.MsoChpDefault
{mso-style-type:export-only;
font-size:10.0pt;}
@page WordSection1
{size:8.5in 11.0in;
margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
{page:WordSection1;}
--></style></head><body lang="EN-US" link="blue" vlink="purple"><div class="WordSection1"><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d">Benn:</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d"> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d">I have no questions about our work. I have questions about the competition\u2019s work. </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d"> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d">I want to complete on equal footing: code compliant, quality installations. If houses start burning down due to poor solar installs the industry suffers, as does the effort to mitigate climate change.</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d"> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d">William</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d"> </span></p><div><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif";color:#1f497d">Miller Solar</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif";color:#1f497d">17395 Oak Road, Atascadero, CA 93422</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif";color:#1f497d">805-438-5600</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif";color:#1f497d"><a href="http://www.millersolar.com/"><span style="color:blue">www.millersolar.com</span></a></span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif";color:#1f497d">CA Lic. 773985</span></p><p class="MsoNormal"><span style="color:#1f497d"> </span></p></div><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif";color:#1f497d"> </span></p><div><div style="border:none;border-top:solid #b5c4df 1.0pt;padding:3.0pt 0in 0in 0in"><p class="MsoNormal"><b><span style="font-size:10.0pt;font-family:"Tahoma","sans-serif"">From:</span></b><span style="font-size:10.0pt;font-family:"Tahoma","sans-serif""> Benn Kilburn [mailto:<a href="mailto:benn@skyfireenergy.com">benn@skyfireenergy.com</a>] <br><b>Sent:</b> Wednesday, March 31, 2021 12:25 PM<br><b>To:</b> <a href="mailto:william@millersolar.com">william@millersolar.com</a>; RE-wrenches<br><b>Subject:</b> Re: [RE-wrenches] Odd inspection procedure</span></p></div></div><p class="MsoNormal"> </p><p class="MsoNormal">William, our city inspectors have moved a bit into this direction for some inspections... asking for specific photos fairly similar to the list you were given. </p><div><p class="MsoNormal">While I feel that the inspection process on typical residential (and commercial of all sizes, for that matter) often, but not always, falls terribly short of adequate, in my opinion, I agree with you that the system you described warrants a closer, in person inspection. I would think a follow-up phone call to ask questions would at least help a bit. Maybe if you have (Code) questions about what you did then you should request one?</p></div><div><p class="MsoNormal"> </p></div><div><p class="MsoNormal">Cheers,</p></div><div><p class="MsoNormal"> </p><div id="AppleMailSignature"><p class="MsoNormal">Benn Kilburn</p><div><p class="MsoNormal">SkyFire Energy</p></div><div><p class="MsoNormal">780-906-7807</p></div></div><div><p class="MsoNormal" style="margin-bottom:12.0pt"><br>On Mar 31, 2021, at 10:48 AM, William Miller <<a href="mailto:william@millersolar.com">william@millersolar.com</a>> wrote:</p></div><blockquote style="margin-top:5.0pt;margin-bottom:5.0pt"><div><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">Friends:</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">We just finished a <a href="https://millersolar.com/MillerSolar/Portfolio/Rework/BIG-SUR-SERVICE/Big_Sur_Service_Upgrade.html">grid-tied project</a> that included a pretty complicated service upgrade. The project is in Monterey County, California. The site is pretty remote on the south end of the Big Sur coastline and Highway 1 is closed (as is not uncommon) to the north with a washout. This makes it time consuming for an inspector to reach the site, but even without the washout the travel time is measured in hours.</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">Days in advance we scheduled the final inspection on the building department web-site as is SOP and were awarded a slot for yesterday. Yesterday morning an inspector called at 7:30 AM to announce they were too busy to make the appointment. Instead I was directed to take a series of photographs to verify the validity of our installation work. Below is the list they provided. Note how vague the requirements are, particularly the fifth one. I was told that this process will be standard operation procedure for the County of Monterey in the near future for solar installs. </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">This seems wrong to me. I can\u2019t believe that any collection of photographs can accurately portray if even the most simple photovoltaic system, let alone one with a 300 amp CT service and 400 amp transfer switch, is installed correctly. I know in the 1980s the solar water heating industry had acquired a collective black-eye due to shoddy installation procedures and I fear this is where the PV industry may be headed. </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">I submitted a handful of photos and was granted a final approval. I have very mixed feelings about this \u201csuccess.\u201d I feel like I cheated on a test. </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">I am curious if any of you have had a similar experience to this. As always I am informed and sometimes amused by what I learn on this forum.</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">List of requested photographs:</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> PV module model number, quantity, and location according to the approved plan. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Roof penetrations flashed/sealed according to the approved plan. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Array exposed cables are properly secured, supported, and routed to prevent physical damage. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Grounding/bonding of rack and modules according to the manufacturer\u2019s installation instructions. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Equipment installed, listed and labeled according to the approved plan (e.g., PV modules, dc/dc converters, combiners, inverters, rapid shutdown equipment). </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Overcurrent devices are the type and size according to the approved plan. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Disconnects according to the approved plan and properly located as required by the NEC. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> PV system markings, labels and signs according to the approved plan. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Connection of the PV system to the grounding electrode system according to the approved plan. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> Access and working space for operation and maintenance of PV equipment such as inverters, disconnecting means and panelboards (not required for PV modules) [NEC 110.26]. </p><p class="MsoNormal"><span style="font-family:"Segoe UI Symbol","sans-serif"">\u2610</span> The rapid shutdown system is installed and operational according to the approved plan [NEC 690.12].</p><p class="MsoNormal"> </p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif"">William Miller</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Verdana","sans-serif""> </span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif"">Miller Solar</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif"">17395 Oak Road, Atascadero, CA 93422</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif"">805-438-5600</span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif""><a href="http://www.millersolar.com/">www.millersolar.com</a></span></p><p class="MsoNormal"><span style="font-size:12.0pt;font-family:"Arial","sans-serif"">CA Lic. 773985</span></p><p class="MsoNormal"> </p><p class="MsoNormal"> </p></div></blockquote><blockquote style="margin-top:5.0pt;margin-bottom:5.0pt"><div><p class="MsoNormal" style="margin-bottom:12.0pt"><span style="font-size:12.0pt;font-family:"Times New Roman","serif"">_______________________________________________<br>List sponsored by Redwood Alliance<br><br>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br><br>Change listserver email address & settings:<br><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br><br>There are two list archives for searching. When one doesn't work, try the other:<br><a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a><br><a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br><br>List rules & etiquette:<br><a href="http://www.re-wrenches.org/etiquette.htm">http://www.re-wrenches.org/etiquette.htm</a><br><br>Check out or update participant bios:<br><a href="http://www.members.re-wrenches.org">http://www.members.re-wrenches.org</a></span></p></div></blockquote></div></div></body></html>