Hello Wrenches,<br><br>
I believe it is a code requirement to install conduits in their entirety
before pulling wire through, and that this applies to all types of&nbsp;
rigid conduit. <br><br>
Is this correct? Does anyone know where in the NEC this is
stated?<br><br>
Thank you,<br><br>
Drake<br><br>