<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto">300.18<br><br><div dir="ltr">Brian</div><div dir="ltr"><br><blockquote type="cite">On Mar 4, 2021, at 1:11 PM, Drake &lt;drake.chamberlin@redwoodalliance.org&gt; wrote:<br><br></blockquote></div><blockquote type="cite"><div dir="ltr">\ufeff

Hello Wrenches,<br><br>
I believe it is a code requirement to install conduits in their entirety
before pulling wire through, and that this applies to all types of&nbsp;
rigid conduit. <br><br>
Is this correct? Does anyone know where in the NEC this is
stated?<br><br>
Thank you,<br><br>
Drake<br><br>
<br>
<font size="2">Drake Chamberlin<br>
<i>Athens Electric LLC<br>
OH License 44810<br>
CO ME Licence 4526<br>
NABCEP Certified Solar PV <br>
740-448-7328<br>
</i><a href="http://athens-electric.com/">http://athens-electric.com/<br>
<br>
</a></font>

<span>_______________________________________________</span><br><span>List sponsored by Redwood Alliance</span><br><span></span><br><span>List Address: RE-wrenches@lists.re-wrenches.org</span><br><span></span><br><span>Change listserver email address &amp; settings:</span><br><span>http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</span><br><span></span><br><span>There are two list archives for searching. When one doesn't work, try the other:</span><br><span>https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</span><br><span>http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</span><br><span></span><br><span>List rules &amp; etiquette:</span><br><span>http://www.re-wrenches.org/etiquette.htm</span><br><span></span><br><span>Check out or update participant bios:</span><br><span>http://www.members.re-wrenches.org</span><br><span></span><br></div></blockquote></body></html>