<div dir="ltr"><div>Hi All,</div><div><br></div><div>I have a utility that is hinting that they are going to deny my interconnection application with a supply side connection and require a load side.  Has anyone seen this before?</div><div><br></div><div>(Proposed interconnection would be with Milbank step lugs in a 200 A socket and a 60 A fused disconnect within 10 feet.)<br></div><div><br></div><div>If they refuse it, i am thinking that registering a complaint with the Wisconsin PSC may be appropriate.</div><div><br></div><div>Kris<br></div><div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><br></div><div dir="ltr"><br></div><div dir="ltr">Shine On!<br><br>Kris Schmid<br>Legacy Solar, LLC<br>137 West 1st Avenue<br>Luck, WI 54853<br><a href="http://www.legacysolar.com" target="_blank">www.legacysolar.com</a><br>715-653-4295<br>NABCEP Certified PV Installation Professional<br>Licensed Wisconsin Master Electrician<br>BSEE<div style="padding:0px;margin-left:0px;margin-top:0px;overflow:hidden;word-wrap:break-word;color:black;font-size:10px;text-align:left;line-height:130%"></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div>