<div dir="ltr"><p class="MsoNormal" style="margin:0in 0in 0.0001pt;font-size:11pt;font-family:Calibri,sans-serif">Hi all,</p>
<p class="MsoNormal" style="margin:0in 0in 0.0001pt;font-size:11pt;font-family:Calibri,sans-serif">Looking at a project with a 1000A fused disconnect at the
POI connecting on the supply side of an existing service. I\u2019m curious if
there\u2019s a general consensus in the industry on whether the requirements of
230.95 would apply here and whether best-practice (or requirement) would
dictate use of an LSIG breaker instead of the disco. I know some will say that
this is a \u201csupply side connection\u201d and not a service so 230 doesn\u2019t apply. This
would also introduce some other oddities like connecting a PV system behind
GFP, not allowed by 705.32, though I believe the exception to 705.32 would
apply since it\u2019s a dedicated GFP for the second source. </p>
<p class="MsoNormal" style="margin:0in 0in 0.0001pt;font-size:11pt;font-family:Calibri,sans-serif"> </p>
<p class="MsoNormal" style="margin:0in 0in 0.0001pt;font-size:11pt;font-family:Calibri,sans-serif">Thanks in advance!</p>
<p class="MsoNormal" style="margin:0in 0in 0.0001pt;font-size:11pt;font-family:Calibri,sans-serif">Evan</p></div>