<div dir="ltr">Jeff,<div>While this is a big thread but if I understand correctly, especially with your last comment &quot;combiner cost is to high&quot;. I use a fiberglass 14 x12 junction box with a hinged cover along with  a power distribution block. Total cost is just a bit over $200 bucks. Attached is a picture. If you want specific p/n contact me off list and I&#39;d be happy to share.</div><div><br></div><div>Christopher</div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Wed, Oct 23, 2019 at 6:04 PM Jeff Clearwater &lt;<a href="mailto:jeffc@villagepowerdesign.com">jeffc@villagepowerdesign.com</a>&gt; wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="auto">Hey William,<div><br></div><div>That exact unit is actually where I started this journey but PG&amp;E will not accept that Solarready residential unit because it\u2019s a commercial account and anything over 200 A in a commercial account requires a CT cabinet. So to avoid CTs we need to separate out the 200 amp meter socket.</div><div><br></div><div>I could feed that unit with 200 Amos after a 200 A Meter\Main but the combined cost would be high. </div><div>Best,</div><div><br></div><div>Jeff</div><div><br></div><div><div id="gmail-m_7303910619933040691AppleMailSignature" dir="ltr">Sent from my iPhone</div><div dir="ltr"><br>On Oct 23, 2019, at 10:59 AM, William Miller &lt;<a href="mailto:william@millersolar.com" target="_blank">william@millersolar.com</a>&gt; wrote:<br><br></div><blockquote type="cite"><div dir="ltr"><div><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)">Jeff:</span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)"> </span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)">Would a class 320, solar-ready, meter/main combo be approved for this commercial application?  Here is a <a href="https://www.downloads.siemens.com/download-center/download?BTLV_44465" target="_blank">link</a> to a product we have used in residential applications.  It offers through-the-jaws metering at 400 amps peak, 320 amps continuous.</span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)"> </span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)">William</span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)"> </span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)"> </span></p><div><p class="MsoNormal"><span style="font-size:12pt;font-family:Arial,sans-serif;color:rgb(31,73,125)">Miller Solar</span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Arial,sans-serif;color:rgb(31,73,125)">17395 Oak Road, Atascadero, CA 93422</span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Arial,sans-serif;color:rgb(31,73,125)">805-438-5600</span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Arial,sans-serif;color:rgb(31,73,125)"><a href="http://www.millersolar.com/" target="_blank"><span style="color:blue">www.millersolar.com</span></a></span></p><p class="MsoNormal"><span style="font-size:12pt;font-family:Arial,sans-serif;color:rgb(31,73,125)">CA Lic. 773985</span></p></div><p class="MsoNormal"><span style="font-size:12pt;font-family:Verdana,sans-serif;color:rgb(31,73,125)"> </span></p><div><div style="border-right:none;border-bottom:none;border-left:none;border-top:1pt solid rgb(181,196,223);padding:3pt 0in 0in"><p class="MsoNormal"><b><span style="font-size:10pt;font-family:Tahoma,sans-serif;color:windowtext">From:</span></b><span style="font-size:10pt;font-family:Tahoma,sans-serif;color:windowtext"> RE-wrenches [mailto:<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org" target="_blank">re-wrenches-bounces@lists.re-wrenches.org</a>] <b>On Behalf Of </b>Jeff Clearwater<br><b>Sent:</b> Wednesday, October 23, 2019 9:11 AM<br><b>To:</b> RE-wrenches<br><b>Subject:</b> Re: [RE-wrenches] SolarReady Service Panel vs adding Supply Side connection?</span></p></div></div><p class="MsoNormal"> </p><p class="MsoNormal">Hey Jay,<br><br>Yes so you were on to it - but with the addition of having that downstream of a separate 200 AMP meter box and 200 A Main that works :)  Otherwise PG&amp;E would call it a 400 Amp service which for commercial accounts means having to have CTs for the metering.<br><br>Thanks!,<br><br>Jeff<br><br>Jay wrote on 10/17/19 3:38 PM:<br><br><br></p><div><p class="MsoNormal">What about installing a 200 amp breaker in the 400 amp buss box?  </p></div><div><p class="MsoNormal"> </p></div><div><p class="MsoNormal">We talk a lot about doing it for smaller boxes, is there a reason it won\u2019t work here?</p></div><div><p class="MsoNormal"> </p></div><div><p class="MsoNormal">Jay</p></div><div><p class="MsoNormal">Peltz power</p></div><div><p class="MsoNormal"><br><br></p><p class="MsoNormal" style="margin-bottom:12pt">On Oct 17, 2019, at 1:30 PM, Glenn Burt <a href="mailto:Glenn.burt@glbcc.com" target="_blank">&lt;Glenn.burt@glbcc.com&gt;</a> wrote:</p></div><blockquote style="margin-top:5pt;margin-bottom:5pt"><div><p class="MsoNormal">\ufeff<span style="font-size:12pt;font-family:&quot;Times New Roman&quot;,serif"></span></p><p class="MsoNormal"><span style="color:windowtext">Hi Jeff,</span></p><p class="MsoNormal"><span style="color:windowtext"> </span></p><p class="MsoNormal"><span style="color:windowtext">Seems to me if allowed in your jurisdiction, you might be best served by installing a new 200A fused service disconnect ahead of the existing main service panel. Or even a 400A one to allow for additional work inside (CT\u2019s), then perform a supply side connection in it. Some manufacturers of switchgear have an option for lugs that accept multiple conductors, so no piercing of conductors needs to happen.</span></p><p class="MsoNormal"><span style="color:windowtext"> </span></p><p class="MsoNormal"><span style="color:windowtext">Good luck,</span></p><p class="MsoNormal"><span style="color:windowtext">Glenn</span></p><p class="MsoNormal"><span style="color:windowtext"> </span></p><div><div style="border-right:none;border-bottom:none;border-left:none;border-top:1pt solid rgb(225,225,225);padding:3pt 0in 0in"><p class="MsoNormal"><b><span style="color:windowtext">From:</span></b><span style="color:windowtext"> RE-wrenches <a href="mailto:re-wrenches-bounces@lists.re-wrenches.org" target="_blank">&lt;re-wrenches-bounces@lists.re-wrenches.org&gt;</a> <b>On Behalf Of </b>Jeff Clearwater<br><b>Sent:</b> Thursday, October 17, 2019 3:20 PM<br><b>To:</b> RE-wrenches <a href="mailto:re-wrenches@lists.re-wrenches.org" target="_blank">&lt;re-wrenches@lists.re-wrenches.org&gt;</a><br><b>Subject:</b> [RE-wrenches] SolarReady Service Panel vs adding Supply Side connection?</span></p></div></div><p class="MsoNormal"> </p><p class="MsoNormal" style="margin-bottom:12pt">Esteemed Wrenches,<br><br>I am in need of changing out an existing 200 Amp service entrance in order to accommodate a bus capable of handling a a 200 Amp Solar backfeed (41 KW system) .  <br><br>PG&amp;E is upgrading the transformer to handle the backfeed but when I proposed a Siemens SolarReady 400 Amp service entrance they couldn&#39;t approve it cause since the building is a shop - they classify it as commercial and require a panel that can handle CTs when there is a 400 Amp service involved.<br><br>Anyone else faced with this have solutions?  What is the cheapest equipment I can provide to satisfy all requirements?<br><br>We don&#39;t need to upgrade the existing 200 amp service entrance equipment for load purposes - only to meet the bus requirements of backfeed.<br><br>Would it be cheaper and easier to use the existing (or new) 200 Amp residential panel - not call it a 400 Amp upgrade but simply add a 200 Amp Supply Side Connection?  Suggested equipment to do that in the most economical manner?<br><br>Any help well appreciated!<br><br>Jeff <br><br><br><br><br><br><br><br><br></p><div><p class="MsoNormal">-- <br>~~~~~~~~~~~</p><div><p class="MsoNormal">Jeff Clearwater<br>Village Power Design<br><a href="https://www.linkedin.com/in/jeff-clearwater-0622a312/" target="_blank">linkedin</a> <br><a href="http://www.villagepowerdesign.com" target="_blank">www.villagepowerdesign.com</a><br>cell - <span><span style="color:rgb(80,80,80)">413-559-9763</span></span><span style="color:rgb(80,80,80)"><br><span>~~~~~~~~~~~~~~~~~~~~~~~</span></span></p></div></div><p class="MsoNormal" style="margin-bottom:12pt"><span style="font-size:12pt;font-family:&quot;Times New Roman&quot;,serif">_______________________________________________<br>List sponsored by Redwood Alliance<br><br>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br><br>Change listserver email address &amp; settings:<br><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br><br>List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br><br>List rules &amp; etiquette:<br><a href="http://www.re-wrenches.org/etiquette.htm" target="_blank">www.re-wrenches.org/etiquette.htm</a><br><br>Check out or update participant bios:<br><a href="http://www.members.re-wrenches.org" target="_blank">www.members.re-wrenches.org</a></span></p></div></blockquote><p class="MsoNormal"><span style="font-size:12pt;font-family:&quot;Times New Roman&quot;,serif"><br><br><br></span></p><pre>_______________________________________________</pre><pre>List sponsored by Redwood Alliance</pre><pre> </pre><pre>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a></pre><pre> </pre><pre>Change listserver email address &amp; settings:</pre><pre><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a></pre><pre> </pre><pre>List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a></pre><pre> </pre><pre>List rules &amp; etiquette:</pre><pre><a href="http://www.re-wrenches.org/etiquette.htm" target="_blank">www.re-wrenches.org/etiquette.htm</a></pre><pre> </pre><pre>Check out or update participant bios:</pre><pre><a href="http://www.members.re-wrenches.org" target="_blank">www.members.re-wrenches.org</a></pre><pre> </pre><p class="MsoNormal"><span style="font-size:12pt;font-family:&quot;Times New Roman&quot;,serif"> </span></p></div>
</div></blockquote></div></div>_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address &amp; settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" rel="noreferrer" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules &amp; etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer" target="_blank">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer" target="_blank">www.members.re-wrenches.org</a><br>
<br>
</blockquote></div><br clear="all"><div><br></div>-- <br><div dir="ltr" class="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div dir="ltr"><div dir="ltr"><p style="text-align:center"><span style="font-size:10pt;color:rgb(31,73,125)"><font face="Arial, sans-serif">Chris Schaefer\u2019s<br></font></span><a href="http:www.solarandwindfx.com" style="font-size:12.8px" target="_blank"><img src="http://www.solarandwindfx.com/wp-content/uploads/2015/01/Solar-Wind-FX-Logo.png" width="200" height="40" style="color: rgb(31, 73, 125); font-family: Arial, sans-serif; font-size: 10pt;"></a><br><i><span style="font-family:Arial,sans-serif;color:rgb(31,73,125)"><span style="font-size:9pt">Tel/Fax
585-229-2083 or Cell 585-748-1870 </span><span style="font-size:12px"><br></span></span></i><i style="font-size:12.8px"><span style="font-size:10pt"><font color="#1f497d"><font face="Arial, sans-serif">5115
South Hill Road ~ Canandaigua New York 14424<br></font></font></span></i><i style="font-size:12.8px"><span style="font-size:10pt;font-family:Arial,sans-serif;color:rgb(31,73,125)"><a href="http://www.solarandwindfx.com" target="_blank"><span style="color:blue">www.solarandwindfx.com</span></a> ~ E-mail: <span style="color:blue"><a href="mailto:chris@solarandwindfx.com" target="_blank">chris@solarandwindfx.com</a></span></span></i></p><p style="text-align:center"><i><span style="font-size:10pt;font-family:Arial,sans-serif;color:rgb(31,73,125)"><img src="http://solarandwindfx.com/wp-content/uploads/2015/01/certs.jpg" width="200" height="56"><br></span></i></p>

<p style="text-align:center"><span style="font-size:10pt;font-family:Arial,sans-serif;color:black">Thomas Jefferson,
the author of our great Constitution, once said, &quot;democracy&quot; will
cease to exist when you take away from those who are willing to work and give
to those who would not.&quot;</span><span style="font-size:10pt;font-family:Arial,sans-serif;color:rgb(31,73,125)"></span></p></div></div></div></div></div></div>