<div dir="ltr"><div>Hi All,</div><div><br></div><div>I&#39;ve been asked to review a GT-BBUS that was installed with a DC to AC ratio of 2.14.  The system owner is frustrated b/c his 9.2-kW of PV  is bottlenecked by an 80A MPPT (~4,300W).  The inverter is a XW-5548 so there is a second bottleneck to overcome even if an additional CC were added.</div><div><br></div><div>My inclination is to install a GT inverter for half the array and make a separate point of connection.  I have considered adding a transfer switch on the PV conductors to allow the owner to toggle between this new GT inverter and the existing CC.  I thought that having the option would be of benefit during extended outages with little sun.</div><div><br></div><div>I&#39;d be curious to know if anyone has had to solve a problem similar to this one and if they were able to find a suitable switch.  To-date, I have not located a good transfer switch or breaker assembly with handle-tie etc...  Any thoughts are greatly appreciated.<br></div><div><br>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div><div>Matt Sherald<br></div>PIMBY Energy, LLC<br></div><div>NABCEP Certified Solar PV InstallerŪ<br></div><div>304-704-5943<br><br></div><span><a href="http://www.getpimby.blogspot.com" target="_blank">www.getpimby.blogspot.com</a><br></span><a href="http://www.getpimby.com" target="_blank">www.getpimby.com</a><br></div><br></div></div></div></div>