<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8">
</head>
<body>
<div dir="auto">
<div>Thanks Jerry.&nbsp; Yes, there is a single combiner box.&nbsp; I believe it's 49 strings of 11 Sunpower 220's, positive grounded.</div>
<div dir="auto"><br>
</div>
<div dir="auto">Regarding Hi-Q, how many failures did you have?&nbsp; Maybe we order some spares to limit downtime when one fails.&nbsp; Are they any better now that they're called Pro Harvest?</div>
<div dir="auto"><br>
</div>
<div dir="auto">David<br>
<div dir="auto"><br>
<div class="elided-text">On Jun 5, 2019 10:30 PM, Jerry Shafer &lt;jerrysgarage01@gmail.com&gt; wrote:<br type="attribution">
<blockquote style="margin:0 0 0 0.8ex;border-left:1px #ccc solid;padding-left:1ex">
<div>
<div dir="auto">David
<div dir="auto">We had a real issue with Hi-Q warranty replacements, it took months. Does this GT System have a combiner that you could go with any of the three phase inverters. Just a thought</div>
<div dir="auto">Jerry</div>
</div>
<br>
<div class="elided-text">
<div dir="ltr">On Wed, Jun 5, 2019, 2:11 PM David Buckner &lt;<a href="mailto:dbuckner@solaresystems.com">dbuckner@solaresystems.com</a>&gt; wrote:<br>
</div>
<blockquote style="margin:0 0 0 0.8ex;border-left:1px #ccc solid;padding-left:1ex">
Hi all,<br>
<br>
We are working with a Xantrex GT 100 that appears on it's last legs.&nbsp; Schneider shipped a matrix and we installed it but that didn't work.&nbsp; Now they say we need to install a CCU and new motherboard.&nbsp; I believe I have all this right.&nbsp; If there is a way to replace
 the whole inverter with a legacy 600Vdc inverter instead, I'd do that.&nbsp; Any ideas on were to get those?&nbsp; Solectria PVI 95 seems like it would work.&nbsp; Otherwise our engineer could look at retrofitting the system with Hi-Q inverters.&nbsp; Any wisdom here would be
 greatly appreciated!<br>
<br>
David<br>
<br>
<br>
--<br>
David Buckner<br>
President<br>
<br>
Solar Energy Systems, LLC.<br>
1205 Manhattan Avenue<br>
Suite 1210<br>
Brooklyn, NY 11222-1058<br>
<br>
ph 917-848-0215<br>
e&nbsp; <a href="mailto:dbuckner@solaresystems.com">dbuckner@solaresystems.com</a><br>
<br>
<br>
<br>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address &amp; settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html">
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules &amp; etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a><br>
<br>
</blockquote>
</div>
</div>
</blockquote>
</div>
<br>
</div>
</div>
</div>
</body>
</html>