<div dir="ltr">DRakes suggestion has the advantage of the DC side is not a voltage sensitive as the AC side and voltage drop is not as critical.  allowing perhaps a 3% </div><br><div class="gmail_quote"><div dir="ltr">On Mon, Sep 17, 2018 at 12:50 PM &lt;<a href="mailto:drake.chamberlin@redwoodalliance.org" target="_blank">drake.chamberlin@redwoodalliance.org</a>&gt; wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div style="font-family:Helvetica,Arial,sans-serif;font-size:12px">Another option would be to locate the inverters near the grid and run the DC at as high a voltage as possible. Have a separate run of wire for each of the 5 inverters. If you ran the DC at 500 V, an 11.4 kW inverter would only draw 22.8. A. Use 2/0 AL for a little over 1% VD at full power. <br><br><br><blockquote class="m_4656400053321954663m_2707036534326397802atmailquote"><br>----- Original Message -----<br><div id="m_4656400053321954663m_2707036534326397802origionalMessageFromField" style="width:100%;display:inline;background:rgb(228,228,228)"><div style="display:inline;font-weight:bold">From:</div> &quot;RE-wrenches&quot; &lt;<a href="mailto:re-wrenches@lists.re-wrenches.org" target="_blank">re-wrenches@lists.re-wrenches.org</a>&gt;</div><br><div id="m_4656400053321954663m_2707036534326397802origionalMessageToField" style="display:inline;font-weight:bold">To:</div>&quot;RE-wrenches&quot; &lt;<a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a>&gt;<br><div id="m_4656400053321954663m_2707036534326397802origionalMessageSentField" style="display:inline;font-weight:bold">Cc:</div><br><div style="display:inline;font-weight:bold">Sent:</div>Mon, 17 Sep 2018 09:42:01 -0700<br><div id="m_4656400053321954663m_2707036534326397802origionalMessageSubjectField" style="display:inline;font-weight:bold">Subject:</div>[RE-wrenches] Step-up/Step-down Transformer question<br><br><br><div dir="ltr">

<span style="font-size:12.8px;float:none;display:inline">Wrenches,</span><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">We have a PV array situated about 900&#39; from the POI (240V 1PH). We initially spec&#39;d (5) 11.4kW inverters and the combined output would be 238A. The wire size required for this current over that distance is cost prohibitive.</div><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">A solution was to use a single 50kW 3 phase inverter at the array and then convert it to 240V... somehow? Is anyone familiar with how to go about doing this? My thought was to have a step down transformer at the POI and pull off two legs to get 240V. Is this even a thing?</div><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">The other, more expensive option is to use a step up transformer at the array and a step down at the POI to get us a smaller wire size.</div><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">Thanks for any input.</div>

<br style="clear:both"><div><br></div>-- <br><div class="m_4656400053321954663m_2707036534326397802gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><span style="background-color:rgb(255,255,255)"><span style="color:#0b5394"><span style="text-decoration:underline;font-weight:bold">Loren Ortiz   Commercial PV Designer</span></span></span></div><div><span style="background-color:rgb(255,255,255)"><span style="color:#0b5394"><span style="text-decoration:underline;font-weight:bold"><br></span></span></span></div><div><span style="background-color:rgb(255,255,255)"><span style="color:#0b5394"><b>  </b>  <a href="mailto:lorenzo@cal-solar.com" target="_blank">loren@cal-solar.com</a><b>  (530) 274-3671</b></span></span></div>  <br><div><br></div></div></div></div></div></div></div></div></div></div></div></div></div>
</div>

<br><div style="text-align:left"><a href="http://californiasolarco.com/referral-program/" target="_blank"></a></div><div style="text-align:left"><b style="color:rgb(153,153,153);font-size:12.6667px;background-color:rgb(255,255,255);font-family:arial,helvetica,sans-serif">Showroom located at: 149 E Main St. Grass Valley, CA 95945</b></div>

        </blockquote></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address &amp; settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" rel="noreferrer" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules &amp; etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer" target="_blank">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer" target="_blank">www.members.re-wrenches.org</a><br>
<br>
</blockquote></div>