<div dir="ltr">Diversion load controller and diversion loads will work every time, no matter what the equipment.<div><br clear="all"><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><span style="font-size:12.8px">Dan Fink</span><div style="font-size:12.8px">Professor of Solar Energy Technology, Ecotech Institute</div><div style="font-size:12.8px">IREC Certified Instructor\u2122 for: </div><div style="font-size:12.8px">~ PV Installation Professional</div><div style="font-size:12.8px">~ Small Wind Installer</div><div style="font-size:12.8px">Executive Director, Buckville Energy</div><div style="font-size:12.8px">NABCEP Registered Continuing Education Providers\u2122</div><div style="font-size:12.8px">NABCEP PV Associate</div><div style="font-size:12.8px"><br><a value="+19706724342" style="color:rgb(17,85,204)">970.672.4342</a></div><br> </div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div><br></div></div><br><div class="gmail_quote"><div dir="ltr">On Wed, Sep 12, 2018 at 7:31 PM Wayne Irwin &lt;<a href="mailto:PureEnergySolar@hotmail.com">PureEnergySolar@hotmail.com</a>&gt; wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">




<div dir="ltr">
<div id="m_7176712071697344556divtagdefaultwrapper" style="font-size:12pt;color:#000000;font-family:Calibri,Helvetica,sans-serif" dir="ltr">
<p style="margin-top:0;margin-bottom:0">Looks like standard AC coupling. <br>
</p>
<p style="margin-top:0;margin-bottom:0">We typically just redo the whole system rather than retro fit. Depending on the system size, it&#39;s usually not that much more work (racking is already up) and the end result is always a regulated charge to the batteries.</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<p style="margin-top:0;margin-bottom:0">It would be great if someone would come up with a regulated AC coupled charge versus an all or nothing approach via phase shifting or relay controlled.<br>
</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<div id="m_7176712071697344556Signature">
<div id="m_7176712071697344556divtagdefaultwrapper" dir="ltr" style="font-size:12pt;color:rgb(0,0,0);font-family:Calibri,Helvetica,sans-serif,&quot;EmojiFont&quot;,&quot;Apple Color Emoji&quot;,&quot;Segoe UI Emoji&quot;,NotoColorEmoji,&quot;Segoe UI Symbol&quot;,&quot;Android Emoji&quot;,EmojiSymbols">
<p style="margin-top:0;margin-bottom:0"></p>
<div><span style="color:rgb(75,165,36)">Wayne Irwin</span><br>
<span style="color:rgb(75,165,36)">President</span><br>
<span style="color:rgb(75,165,36)">License #CVC56695</span><br>
<span style="color:rgb(75,165,36)">State Licensed Solar Contractor</span><br>
<span style="color:rgb(75,165,36)">Pure Energy Solar International Inc.</span><br>
<span style="color:rgb(75,165,36)">Wayne@PureEnergySolar.com</span><br>
<span style="color:rgb(75,165,36)"><a href="http://PureEnergySolar.com" class="m_7176712071697344556OWAAutoLink" id="m_7176712071697344556LPNoLP" target="_blank">http://PureEnergySolar.com</a></span><br>
<span style="color:rgb(75,165,36)"><a href="http://SolarChargingStation.net" class="m_7176712071697344556OWAAutoLink" id="m_7176712071697344556LPNoLP" target="_blank">http://SolarChargingStation.net</a></span><br>
<span style="color:rgb(75,165,36)">352 377-6527 Office</span><br>
<span style="color:rgb(75,165,36)">352 336-3299 Fax</span><br>
<span style="color:rgb(75,165,36)"></span><br>
<span style="color:rgb(75,165,36)"></span><br>
<span style="color:rgb(75,165,36)">The Sun Is Always Shining!</span><br>
<br>
The content of this message is Pure Energy Solar Confidential. If you are not the intended recipient and have received this message in error, any use or distribution is prohibited. Please notify me immediately by reply e-mail and delete this message from your
 computer system. Thank you.</div>
<br>
<p></p>
</div>
</div>
<br>
<br>
<div style="color:rgb(0,0,0)">
<hr style="display:inline-block;width:98%">
<div id="m_7176712071697344556divRplyFwdMsg" dir="ltr"><font style="font-size:11pt" face="Calibri, sans-serif" color="#000000"><b>From:</b> RE-wrenches &lt;<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org" target="_blank">re-wrenches-bounces@lists.re-wrenches.org</a>&gt; on behalf of Ken Schaal &lt;<a href="mailto:Ken@commonwealthsolar.com" target="_blank">Ken@commonwealthsolar.com</a>&gt;<br>
<b>Sent:</b> Wednesday, September 12, 2018 8:11 PM<br>
<b>To:</b> RE-wrenches; Ken Schaal<br>
<b>Subject:</b> [RE-wrenches] Any thoughts on this approach to adding battery backup to an existing grid tie system will be appreciated.</font>
<div> </div>
</div>

<div>
<div dir="auto"><a href="https://www.youtube.com/watch?v=eyhkIfS5Z-Q" id="m_7176712071697344556LPlnk140899" class="m_7176712071697344556OWAAutoLink" target="_blank">https://www.youtube.com/watch?v=eyhkIfS5Z-Q</a></div>
</div>
</div>
</div>
</div>

_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address &amp; settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" rel="noreferrer" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules &amp; etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer" target="_blank">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer" target="_blank">www.members.re-wrenches.org</a><br>
<br>
</blockquote></div>