<div dir="ltr">Hello Wrenches,<div>What are you all seeing required as setbacks post 2017? I am having inspectors vary between wanting a 3' lane at the bottom and sides to allowing the array down to the gutter, and from requiring between 18" and 3' at the ridge. <br clear="all"><div><br></div>-- <br><div class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><span style="border-collapse:collapse;font-family:arial,sans-serif;font-size:13px">Gary Easton<br>Appalachian Renewable Power</span><div><span style="border-collapse:collapse;font-family:arial,sans-serif;font-size:13px">Stewart, Ohio 45778<br>NABCEP Certified Solar PV <br>T: <a value="+17402778498" style="color:rgb(6,88,181)">740-277-8498</a></span><div><span style="border-collapse:collapse;font-family:arial,sans-serif;font-size:13px"><a value="+17402778498" style="color:rgb(6,88,181)"></a> <a href="http://www.arp-solar.com" target="_blank">www.arp-solar.com</a></span></div></div><div><br></div><div><h1 style="margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px;color:rgb(0,51,153);font-family:Arial,sans-serif;font-size:12px">\u201cFirst they ignore you. Then they laugh at you. Then they fight you. Then you win.\u201d</h1></div><div>~Ghandi</div><div><br></div></div></div>
</div></div>